2. Safety 

2.1    General Safety 

2.1.1  Consult and follow local codes and other applicable laws concerning required permitting 

as well as installation & inspection requirements, rules, and regulations. 

2.1.2  PV modules should be installed and maintained by qualified personnel. 
2.1.3  Use the same performance modules within a given series. 
2.1.4  Follow all safety precautions of all components used in the system. 
2.1.5  Do not shade portions of the PV module surface from the sun for a long period of time. 

The shaded cell may become hot (hot spot phenomenon), which can result in solder joints 
peeling off. 

2.1.6  Do not clean the glass surface with chemicals. 
2.1.7  Do not drop the PV module or drop objects onto the PV module. 
2.1.8  Do not concentrate sunlight on the modules or panels. 
2.1.9  Do not attempt to disassemble the modules, and do not remove any attached components 

from the modules. 

2.1.10 Do not scratch or hit at the back sheet, the glass, the terminal box. Do not pull the cables 

or touch them with bare hands. 

2.1.11 Do not drill holes in the frame or scratch the anodized film of the frame. 
2.1.12 Keep the PV module packed in the carton until installation. 
2.1.13 Do not use modules near equipment or in places where flammable gases may be 

generated. 

2.1.14 Do not use modules in an environment with aliphatic, aromatic, phenols, ketones, 

halogenated substance or mineral oil, which may corrode the junction box by chemical 
attack. 

2.2  Installation Safety 

2.2.1  Wear protective clothing such as head gear, insulating gloves, safety shoes as prescribed 

by local safey codes. Use insulated tools when installing the modules. 

2.2.2  Do not install the modules in heavy rain, snow, or otherwise wet or windy conditions. 

2.2.3  Completely  cover  the  PV  module  surface  with  an  opaque  material  during  PV  module 

installation and wiring to prevent accidental charge buildup. 

2.2.4  Plug in connectors tightly when working on wiring. 

2.2.5  Due to the risk of electrical shock, do not perform any work if the terminals of PV module 

are wet. 

2.2.6  Do not touch the terminal box and the end of output cables (connectors) with bare hands. 

Summary of Contents for CHSM60M(DG)/F-B

Page 1: ...nt com Crystalline Silicon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 1 3 Precautions for Installation 2 Safety 2 1 General Safety 2 2 Installation Safety 3 M...

Page 2: ...ense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 1 3 Precautions of Installation...

Page 3: ...ooftop the number of each stack is suggested no more than 20 In case of the poor load bearing capacity it s recommended that the designer and or installer check with the structural engineer or archite...

Page 4: ...e modules 2 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 2 1 11 Do not drill holes in the frame or scratch the anodized...

Page 5: ...t the mounting surface touching the junction box 2 2 17 Standing on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 2 2 18...

Page 6: ...s available as shown in figure 3 While installing the module frame should be parallel to the mounting rack to avoid casting shadow on the rear side as shown in figure 4 Figure 1 Figure 2 Figure 3 Figu...

Page 7: ...Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com Figure 5 3 2 2 Clamping on the frame surface 3 2 2 1 Double glass module During the installation of bifacial modules the fram...

Page 8: ...e added for additional support 3 As for above figure 7 indicates the allowable installation range of the aluminum clamp the recommended installation location is 50 200mm For this installation the modu...

Page 9: ...omponents b The bar s top surface contacted with module frame should come with grooves compatible with an M8 bolt c If the bars do not come with grooves holes of a suitable diameter may need to be dri...

Page 10: ...roduce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module should be multiplied by a factor of 1 25 when determining component cond...

Page 11: ...wire around the bolt Note that the copper wire cannot be attached directly to the aluminum 4 2 4 Put the bolt through the cut washer and then through the hole in the aluminum frame 4 2 5 Add the spri...

Page 12: ...th Dust weather Right away after the dust wind The period of the PV module cleaning shall be determined by the condition of the weather pollution O M operator shall keep a record of weather condition...

Page 13: ...g District Hangzhou P C 310053 Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com CHINT SOLAR ZHEJIANG Co Ltd Add 1335 Bin an Rd Binjiang District Hangzhou China 310053 Tel 86...

Reviews: