materials should be higher than Class A. 

3.1.6  To maintain the modules’ fire performance type 3(for US market), it could be possible to 

achieve the Class A system fire rating, with the Class A class racking system. 

3.2  Installation Methods 

3.2.1  Bolting through the mounting holes 

  All modules must be secured by at least 4 bolts (as shown in figure 1 and 2). For maximum 

safety precaution, it is recommended to make use of all installation holes available, as shown 
in figure 3. 

  While installing, the module frame should be parallel to the mounting rack to avoid casting 

shadow on the rear side, as shown in figure 4. 

 

 

Figure 1                                                                            Figure 2 

 

Figure 3                                                                            Figure 4 

Note:  the  red  arrows  above  is  indicative  of  the  bolts’  location.  The  installation  steps  are  as 
follows ( figure 5 ): 
1.  Place the module underneath the mounting rack. 
2.  Insert 4 stainless bolts (M8) into the mounting holes in figure 1 or 2. 
3.  Make sure that each bolt is installed with two washers, one on each side of the rack. then 

screw them tight onto spring washer or toothed washer, and at last, lock them with stainless 
nuts. 

4.  The reference value of tightening torques should be within 17~23 Nm for M8 bolts. For the 

torque value, recommendations from specific clamping hardware suppliers should prevail. 

Summary of Contents for CHSM60M(DG)/F-B

Page 1: ...nt com Crystalline Silicon PV Module Installation Manual 1 Introduction 1 1 Purpose 1 2 Limitation of Liability 1 3 Precautions for Installation 2 Safety 2 1 General Safety 2 2 Installation Safety 3 M...

Page 2: ...ense arising out of or in any way connected with such installation operation use or maintenance Chint Solar reserves the right to change the manual without prior notice 1 3 Precautions of Installation...

Page 3: ...ooftop the number of each stack is suggested no more than 20 In case of the poor load bearing capacity it s recommended that the designer and or installer check with the structural engineer or archite...

Page 4: ...e modules 2 1 10 Do not scratch or hit at the back sheet the glass the terminal box Do not pull the cables or touch them with bare hands 2 1 11 Do not drill holes in the frame or scratch the anodized...

Page 5: ...t the mounting surface touching the junction box 2 2 17 Standing on the solar PV module is forbidden and also prohibit installation tools or other objects hitting surface of the solar PV module 2 2 18...

Page 6: ...s available as shown in figure 3 While installing the module frame should be parallel to the mounting rack to avoid casting shadow on the rear side as shown in figure 4 Figure 1 Figure 2 Figure 3 Figu...

Page 7: ...Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com Figure 5 3 2 2 Clamping on the frame surface 3 2 2 1 Double glass module During the installation of bifacial modules the fram...

Page 8: ...e added for additional support 3 As for above figure 7 indicates the allowable installation range of the aluminum clamp the recommended installation location is 50 200mm For this installation the modu...

Page 9: ...omponents b The bar s top surface contacted with module frame should come with grooves compatible with an M8 bolt c If the bars do not come with grooves holes of a suitable diameter may need to be dri...

Page 10: ...roduce more current and or voltage than reported at standard test conditions Accordingly the value of Isc marked on this module should be multiplied by a factor of 1 25 when determining component cond...

Page 11: ...wire around the bolt Note that the copper wire cannot be attached directly to the aluminum 4 2 4 Put the bolt through the cut washer and then through the hole in the aluminum frame 4 2 5 Add the spri...

Page 12: ...th Dust weather Right away after the dust wind The period of the PV module cleaning shall be determined by the condition of the weather pollution O M operator shall keep a record of weather condition...

Page 13: ...g District Hangzhou P C 310053 Tel 0086 571 5603 1888 Fax 086 571 5603 2316 Website http energy chint com CHINT SOLAR ZHEJIANG Co Ltd Add 1335 Bin an Rd Binjiang District Hangzhou China 310053 Tel 86...

Reviews: