background image

 

 

 

WENZHOU,CHINA

HANGZHOU,CHINA

SHANGHAI,CHINA

SEOUL,

KOREA

TOKYO,

JAPAN

BANGKOK,

THAILAND

BARCELONA,

SPAIN

SOUTH

SAN FRANCISCO,

USA

RAVENSBURG,

GERMANY

Japan

KoyoAstro Co., Ltd.

Higashi 1-5-6, Chuo-ku, 

Tokyo 103-0004, Japan 

Tel:  + 03 3866 6113

Fax: + 03 3866 6115

Korea

Astronergy Solar Korea

Misung Bldg 3F,

91-5 Banpo-dong, Seocho-gu, 

Seoul, Korea

Tel:  + 82 (0)2 2226 3911

Fax: + 82 (0)2 2226 3910

Thailand

Astronergy Solar Korea (Thailand) Co., 

Ltd.

184/88 Forum Tower 18FL

Ratchadapisek Rd., Huay-Kwang, 

Bangkok 10320 Thailand

Tel:  + 662 645 4155

Fax: + 662 245 3185

BRANCH OFFICES

Spain

Chint Solar Hispania S.L.

Paseo de Gracia, 78, 2-2A

08008 Barcelona, Spain

Tel:  + 34 9346 73778

Fax: + 34 9346 73789

Germany

     

Astronergy GmbH

Karlstr. 8

88212 Ravensburg, Germany

Tel:  + 49 (0)751 295096-0
Fax: + 49 (0)751 295096-39

North America

Astronergy Solar Inc

377 Swift Avenue 

South San Francisco,  CA 94080

USA

Tel:  + 1 650 827 9810

Fax: + 1 650 392 2778

CORPORATE HEADQUARTERS

Chint Solar (ZheJiang) Co., Ltd.

1335 Bin’an Road, Binjiang District

Hangzhou, Zhejiang Province, 310053

China

Tel:  + 86 571 5603 1888
Fax: + 86 571 5603 2383

MANUFACTURING PLANTS

Hanghou, Shanghai & Wenzhou

 

 

 

©

1015 P / 12 - 2011

http://www.astronergy.com

Summary of Contents for CHSM6610M

Page 1: ...THE POWER OF ASTRONERGY CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE...

Page 2: ...2 Safety 3 Mechanical Installation 4 Electrical Installation 5 Maintenance and Disposal 1 1 Purpose 1 2 Limitation of Liability 2 1 General Safety 2 2 Installation Safety 3 1 Installation Condition 3...

Page 3: ...n use or maintenance Astronergy reserves the right to change the manual without prior notice 2 Safety 2 1 General Safety 2 1 1 Consult and follow local codes and other applicable laws concerning requi...

Page 4: ...oting the PV system 2 2 11 Follow the safety regulations for any and all other system components including wires connectors charging regulators batteries inverters etc 2 2 12 Do not expose wires to di...

Page 5: ...ng to figure 1 For maximum security against strong winds and heavy snow all available mounting holes should be used 3 Secure each bolt to the frame with 2 stainless steel washers one on each side of t...

Page 6: ...oves holes of a suitable diameter may need to be drilled to allow bolts to be attached to the bars at the same locations as mentioned before 5 Secure each clamp by attaching plain washer spring washer...

Page 7: ...with figure 6 to determine permitted clamping locations for a given module series for clamping with clamps Module Series Dimension A B C CHSM5409M 1200 554 35 1200 50 250 CHSM5611M 1453 808 35 1453 20...

Page 8: ...r of 1 25 when determining component voltage ratings conductor ampacities fuse sizes and size of controls connected to the PV output 4 1 5 Refer to Section 690 8 of the National Electrical Code for an...

Page 9: ...hen through the hole in the aluminum frame 4 2 4 Add the spring washer and nut on the other side of the bolt and tighten to secure all parts The tightening torque should be 210 20 N cm 5 Maintenance 5...

Page 10: ...g Bangkok 10320 Thailand Tel 662 645 4155 Fax 662 245 3185 BRANCH OFFICES Spain Chint Solar Hispania S L Paseo de Gracia 78 2 2A 08008 Barcelona Spain Tel 34 9346 73778 Fax 34 9346 73789 Germany Astro...

Reviews: