2.1.12  Keep the PV module packed in the carton until installation.
2.1.13  Do not use modules near equipment or in places where flammable gases may be generated.

2.2 

Installation Safety

2.2.1 

Wear protective head gear, insulating gloves, safety shoes, and insulated tools when installing the modules.

2.2.2 

Do not install the modules in rain, snow, or otherwise wet or windy conditions.

2.2.3 

Completely cover the PV module surface with an opaque material during PV module installation and wiring to

                 prevent accidental charge buildup.
2.2.4 

Plug in connectors tightly when working on wiring.

2.2.5 

Due to the risk of electrical shock, do not perform any work if the terminals of PV module are wet.

2.2.6 

Do not touch the terminal box and the end of output cables (connectors) with bare hands.

2.2.7 

Do not unplug the connector under load.

2.2.8 

Do not work alone.

2.2.9 

Wear a safety belt if working far above the ground.

2.2.10  Do not wear metallic jewelry, which can cause electric shock, while installing or troubleshooting the PV system.
2.2.11  Follow the safety regulations for any and all other system components, including wires, connectors, charging
                 regulators, batteries, inverters,   etc.
2.2.12  Do not expose wires to direct sunlight. Use UV-resistant cabling.
2.2.13  Do not damage the surrounding PV modules or mounting structure when replacing a PV module.
2.2.14  Do not change any PV module components (diode, junction box, plug connectors, etc.).

3.  Mechanical Installation

3.1 

Installation Conditions

3.1.1 

Environment temperature: -40 to 85 °C

3.1.2 

Operating temperature: -40 to 85 °C

3.1.3 

Mechanical load on panels (e.g., from wind or snow): less than 5400 Pa

3.1.4 

Tilt Angle selection: The installation should be facing north in the southern hemisphere and facing south in the 

                 northern hemisphere.
3.1.5 

To maintain the modules’ Class C fire rating, the fire class of the roof and building materials should higher than Class C.

3.2 

Installation Methods

3.2.1 Bolts
All modules must be securely fastened with at least 4 bolts. For maximum security against strong winds or heavy snow falls, all 
6 mounting holes (modules CHSM5409M, CHSM6609M/P, and CHSM6610M/P; see figure 1a) or 8 mounting holes (CHSM6611P 
and CHSM6612P; figure 1b) should be used.

Summary of Contents for CHSM6610M

Page 1: ...THE POWER OF ASTRONERGY CRYSTALLINE SILICON PV MODULE INSTALLATION GUIDE...

Page 2: ...2 Safety 3 Mechanical Installation 4 Electrical Installation 5 Maintenance and Disposal 1 1 Purpose 1 2 Limitation of Liability 2 1 General Safety 2 2 Installation Safety 3 1 Installation Condition 3...

Page 3: ...n use or maintenance Astronergy reserves the right to change the manual without prior notice 2 Safety 2 1 General Safety 2 1 1 Consult and follow local codes and other applicable laws concerning requi...

Page 4: ...oting the PV system 2 2 11 Follow the safety regulations for any and all other system components including wires connectors charging regulators batteries inverters etc 2 2 12 Do not expose wires to di...

Page 5: ...ng to figure 1 For maximum security against strong winds and heavy snow all available mounting holes should be used 3 Secure each bolt to the frame with 2 stainless steel washers one on each side of t...

Page 6: ...oves holes of a suitable diameter may need to be drilled to allow bolts to be attached to the bars at the same locations as mentioned before 5 Secure each clamp by attaching plain washer spring washer...

Page 7: ...with figure 6 to determine permitted clamping locations for a given module series for clamping with clamps Module Series Dimension A B C CHSM5409M 1200 554 35 1200 50 250 CHSM5611M 1453 808 35 1453 20...

Page 8: ...r of 1 25 when determining component voltage ratings conductor ampacities fuse sizes and size of controls connected to the PV output 4 1 5 Refer to Section 690 8 of the National Electrical Code for an...