2-9
RS720Q-E9-RS8 Series
Ensure that the storage devices installed correspond to the correct node. For more
information on the nodes and the storage bays, please refer to
1.4 Front panel features
and
1.5 Rear panel features
.
2.5
Storage devices
The system supports two (2) hot-swap storage devices per node. The storage device installed
on the drive tray connects to the Mid Plane via the backplane.
To install a hot-swap storage device:
1. Press the spring lock to release the tray lever and to partially eject the tray from the
bay.
2.
Firmly hold the tray lever and carefully pull the drive tray out of the bay. Place the drive
tray in a clean and flat surface.
3.
Release the screws on each side of the
drive tray to release the drive tray metal
beam.
The drive tray metal beam provides
horizontal support to the empty drive
tray and prevents the drive tray from
being bent or deformed.
Spring lock
Tray lever
4.
Orient and place the storage device
into the tray. Ensure that the storage
device
is fitted firmly inside the drive tray
and that the four screws of the storage
device matches the four screw holes of
the drive tray.
Metal beam
Summary of Contents for RS720Q-E9-RS8
Page 1: ...2U Rackmount Server RS720Q E9 RS8 User Guide ...
Page 12: ...xii ...
Page 45: ...2 21 RS720Q E9 RS8 Series RS720Q E9 RS8 Upper Mid Plane Lower Mid Plane Backplane ...
Page 56: ...Chapter 4 Motherboard Information 4 2 4 1 Motherboard and Mid plane layout Z11PH D12 ...
Page 57: ...4 3 RS720Q E9 RS8 Series RS720Q E9 RS8 S Mid Plane RS720Q E9 RS8 Mid Plane ...
Page 72: ...Chapter 4 Motherboard Information 4 18 ...
Page 118: ...Chapter 5 BIOS Setup 5 46 ...
Page 130: ...Chapter 6 RAID Configuration 6 12 ...
Page 148: ...7 18 Chapter 7 Driver Installation ...
Page 149: ...Appendix Appendix ...
Page 150: ...A 2 Appendix Z11PH D12 block diagram ...
Page 154: ...A 6 Appendix ...