Reinstalling Release 2
The procedure for reinstalling AUDIX Voice Power Release 2 is outlined
below. The exact procedure for each step is included in the step or
described elsewhere, either in this chapter or in other parts of this
document.
1
Use the Backing Up Administrative Files procedure found later in this
chapter to back up all files in the following directories:
/usr/vmdb
/usr/ocdb
/avp/data
/gendb
2
Use the Backing up Speech Files procedure found later in this chapter to
back up the following speech files:
talkfile 46 phrase all
talkfile 47 phrase all
3
Remove the switch integration software by following this procedure:
a
b
c
d
e
f
Log in as root if not already logged in.
At the # prompt, type face and press [Enter].
The AT&T FACE menu appears.
At the AT&T FACE menu, move the cursor to System Administration
and press [Enter].
The System Administration menu appears.
At the System Administration menu, move the cursor to
Software Setup
and press [Enter].
The Software Setup menu appears.
At the Software Setup menu, move the cursor to Remove package
and press [Enter].
A list of packages appears.
Type the number for Switch Interface package and press [Enter].
The package will be removed.
5-4 Upgrade Procedures
Summary of Contents for 6386 WGS
Page 1: ...AT T 999 500 355 Issue 1 July 1990 AUDIX Voice Power Installation and Maintenance Guide...
Page 14: ......
Page 37: ...FIGURE 2 19 Location of Memory SIMM Sockets on 6386 25 WGS Hardware Installation 2 23...
Page 61: ...FIGURE 2 38 6386E 33 WGS System Module Back Panel Hardware Installation 2 47...
Page 112: ......
Page 124: ......
Page 134: ......
Page 205: ......
Page 209: ......