1. Use the basic carrier
as a template to mark
hole Iocations on the
backboard.
2. Drill pilot holes and mount
M o u n t i n g
s u r f a c e
B a s i c
c a r r i e r
Backboard
the basic carrier on the
backboard.
Basic
carrier
Mounting
Screws (4)
3. Slide the earner
into position.
Mounting
hole
FIGURE 2-12 Mounting the basic carrier.
Installing the Control Unit 2-55
Summary of Contents for administration and
Page 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Page 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Page 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Page 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Page 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...