Upper copper label
Tuck label tightly
in corner
Lower copper label
Power unit
information label
UL label
FIGURE 2-18 Proper placement of foil shields and labels on the Power Supply
Module.
7 With the copper-foil shielding in place, place the
power unit information label on the lower piece of foil
as shown in Figure 2-18.
8 Attach the UL label (CSA label as appropriate) on the
Power Supply Module below the copper foil in the
position shown in Figure 2-18.
Installing the Control Unit 2-71