23
24
25
26
Connect a craft set between leads T1 and RI. Select
the tie line being tested using station A. The receiving
end should provide dial tone.
NOTE: The tie line dial tone option should be
administered for remote in order to send dial
tone out to the port being tested.
> If you hear dial
tone and can break it, return to step
8 and select the next tie line for testing.
> If you
hear dial tone and cannoit break it, go to step
24.
> If you
do not hear dial tone, go to step 19
Connect a
craft set between leads T and R. Select the
tie line being tested using station B. The transmitting
end should provide dial tone.
.
> If you hear dial tone and can break it, return to step
8 and select the next tie line for testing.
> If you do not hear dial tone, or you hear dial tone
and cannot break it go to step 19.
Readminister port 1 for Type 1 Standard.
Print out the tie line translation and make sure that all
the ports are configured for Type 1 Standard.
> If the tie lines are translated correctly according to
Form lb, testing is complete.
> If the tie lines are not translated
correctly, repeat
steps 4 through 6.
Tie Line Troubleshooting 4-17
Summary of Contents for administration and
Page 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Page 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Page 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Page 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Page 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...