Preinstallation Requirements
REVIEWING THE
PLANNING FORMS
ENVIRONMENTAL
REQUIREMENTS
Review the completed system planning forms, which
should be on site, before starting installation. The forms
for Release 3 are titled:
●
Form la, System Form—Incoming Lines
●
Form 1b, System Form—Tie Lines
●
Form 1c, System Form—Module Identification
Diagram
●
Form 1d, System Form—Station Planning
●
Form 1e, System Form—Requirements and Options
The forms for Feature Modules 1 and 2 are titled:
●
Master Planning Form
●
System Configuration Form
You should be familiar with the entire layout of the system
including wiring, jack field, network interface, and
accessory requirements. If the system has data hardware,
see the separate manual, MERLIN II Communications
System Data Communications Guide, for complete
instructions for installing data equipment.
The control unit should be operated in an environment that
meets the following conditions.
●
Operating temperatures. The operating temperature
should be 40 to 104
0
F (4 to 40
0
C). Optimum
operating temperature is 60
0
F.
●
Humidity. The humidity should be between 20 and 80
percent.
●
Airborne contamination.
Do not expose the control
unit to moisture, corrosive gas, dust, chemicals, spray
paint, or similar material.
Preinstallation Requirements 2-1
Summary of Contents for administration and
Page 40: ...FIGURE 1 9 System architecture Theory of Operation 1 37 ...
Page 175: ...Top cover Front cover FIGURE 2 27 Control unit covers Testing the System 2 107 ...
Page 211: ...FIGURE 3 I A MERLIN II System Display Console The Administrator Attendant Console 3 3 ...
Page 213: ... FIGURE 3 2 A BIS 34D Console The Administrator Attendant Console 3 5 ...
Page 331: ...General Tests 4 55 Reaming the Control Unit 4 55 Testing Outside Lines 4 56 ...