INSTALLATION
PREINSTALLATION REQUIREMENTS
The AT&T System 25 Reference Manual (555-540-200)
provides a complete
listing of System 25 equipment location requirements. Before installation
begins, check the items described in this section.
Caution:
System 25 cross connect hardware must be located in a
restricted access area only.
Table and Backboard
Verify that an equipment table and cross-connect backboard are installed.
(See Figure 2-8 for a sample layout.) The cross-connect backboard is a 48-
inch by 96-inch by
3/4-inch plywood panel, mounted horizontally 30-inches
above the floor and within 5 feet of the location chosen for the cabinets.
If wall space in the equipment room is limited, an alternate layout may be
provided. If more than four 617A Panels are required, this alternate layout
will require more than one 48-inch by 96-inch plywood panel. See Install
Equipment Room Station Cabling
for details.
Network Interface
The RJ21X network interface (CO lines) installed by the telephone company
must be located within 25 feet of the system cabinets. In addition to the
RJ21X network interface, an RJ2GX interface is required for tie
lines. For T1
interfaces, RJ48X network interfaces must be provided.
If System 25 is
replacing another system and no additional lines are required, the network
interfaces used with the previous system should already be in place.
The network interfaces should also include a coupled bonding conductor
extended from the building service entrance.
2-16
Summary of Contents for Network Adapter 25
Page 1: ...AT T AT T System 25 Installation and Maintenance Manual 555 540 103 B November 1995 ...
Page 18: ...APPENDIX F Administration Error Messages GLOSSARY I N D E X F 1 G 1 I 1 viii ...
Page 31: ...INSTALLATION MOUNTING CENTERS WHEN FLANGES ARE OVERLAPPED Figure 2 2 617A Panel 2 7 ...
Page 33: ...INSTALLATION Z21OA1 ADAPTER Y ADAPTER WP90851 L1 858A ADAPTER Figure 2 3 SIP Adapters 2 9 ...
Page 50: ...INSTALLATION Figure 2 10 Three Cabinet System Front View With Covers Removed 2 26 ...
Page 51: ...INSTALLATION Figure 2 11 Position of Shorting Plugs on CPU Memory Circuit Pack 2 27 ...
Page 72: ...INSTALLATION UPPER ADAPTER MOUNTING CLIP Figure 2 18 Mounting Adapters ...
Page 85: ...INSTALLATION 2 61 ...
Page 92: ...INSTALLATION 2 68 ...
Page 103: ...INSTALLATION Figure 2 32 10B Emergency Transfer Unit 2 78 ...
Page 104: ...INSTALLATION Figure 2 33 Emergency Transfer Unit Connections 2 79 ...
Page 109: ...INSTALLATION Figure 2 35 Attendant Console With DXS Console 2 84 ...
Page 146: ...INSTALLATION 2 119b This page intentionally left blank November 1995 ...
Page 153: ...INSTALLATION This page intentionally left blank 2 124b November 1995 ...
Page 223: ...MAINTENANCE Figure 4 2 Clearing Supply Troubles Sheet 1 of 2 4 47 ...
Page 224: ...MAINTENANCE Figure 4 2 Clearing Power Supply Troubles Sheet 2 of 2 ...
Page 225: ...MAINTENANCE Figure 4 3 Clearing CO Trunk Troubles 4 49 ...
Page 226: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 1 of 4 4 50 ...
Page 227: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 2 of 4 4 51 ...
Page 228: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 3 of 4 4 52 ...
Page 229: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 4 of 4 4 53 ...
Page 231: ...Figure 4 6 Clearing Tie Trunk Troubles Sheet 1 of 5 4 55 ...
Page 232: ...MAINTENANCE 6 7 8 9 10 Figure 4 6 Clearing Tie Trunk Troubles Sheet 2 of 5 4 56 ...
Page 233: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 3 of 5 4 57 ...
Page 234: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 4 of 5 4 58 ...
Page 235: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 5 of 5 4 59 ...
Page 236: ...MAINTENANCE Figure 4 7 Clearing Paging Equipment Troubles ...
Page 250: ...MAINTENANCE Figure 4 9 System Cabinet Backplane Wiring Side Sheet 2 of 2 4 74 ...
Page 251: ...MAINTENANCE Figure 4 10 TDM Signal Designations on Cabinet Backplane 4 75 ...
Page 252: ...MAINTENANCE Figure 4 11 Power Designations on Cabinet Backplane 4 76 ...
Page 263: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 1 of 3 ...
Page 264: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 2 of 3 4 87 ...
Page 265: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 3 of 3 4 88 ...
Page 271: ...MAINTENANCE Figure 4 13 Clearing Switched Loop Attendant Console Troubles Sheet 1 of 5 ...
Page 272: ...MAINTENANCE 4 13 Clearing Switched Loop 2 of 5 Console Troubles Sheet 4 95 ...
Page 273: ...MAINTENANCE Figure 4 13 Clearing Switched 3 of 5 Loop Attendant Console Troubles Sheet 4 96 ...
Page 274: ...MAINTENANCE 4 13 Clearing Switched 4 of 5 Console Troubles 4 97 ...
Page 321: ...APPENDIX E Administration Codes and Data This page is intentionally blank E 2 b ...