INSTALLATION
●
A single-point ground (SPG) system in which the green wire ground
(system ground) and the telephone company ground are connected
to approved building ground.
●
The coupled bonding conductor must be connected between the
telephone company ground at the building entrance and System 25’s
SPG.
●
Surge protection on the ac power to System 25.
For greater than 99 percent of all lightning strikes, the protection outlined
above will do the job.
However, there are a few locations where the
described protection may not be sufficient.
External secondary protection,
located at the trunk access area of the System 25 cross-connect field, can be
employed.
Several commercial units are available.
If 66-type block terminations are
used, a very convenient device is the LP5-230-220 Fused Lightning Protector.
This unit plugs into the 66-block (in place of the shorting bars) and includes
the sneak current fuse. One unit is required per protected pair. A ground
bar is provided with the lightning protection units or can be ordered
separately (Comcode 901-007-120). All lightning protectors located in the
System 25 cross-connect area must be grounded to System 25’s SPG via a
#6AWG copper wire.
In addition, an AC Surge Suppressor (Tll Model 428) may be required. Local
practice should be followed.
The unit plugs directly into one of the quad
outlets and provides a dual outlet to protected equipment. Sufficient units
should be provided to protect all at-powered equipment. Each cabinet in the
system requires a protected outlet, and in addition, a protected outlet is
required for each auxiliary unit, such as the SAT, a tape unit, or a printer.
When a Surge Suppressor is used,
all peripheral equipment directly
connected to System 25 must be connected to alternating current via the
Surge Suppressor.
2-20
Summary of Contents for Network Adapter 25
Page 1: ...AT T AT T System 25 Installation and Maintenance Manual 555 540 103 B November 1995 ...
Page 18: ...APPENDIX F Administration Error Messages GLOSSARY I N D E X F 1 G 1 I 1 viii ...
Page 31: ...INSTALLATION MOUNTING CENTERS WHEN FLANGES ARE OVERLAPPED Figure 2 2 617A Panel 2 7 ...
Page 33: ...INSTALLATION Z21OA1 ADAPTER Y ADAPTER WP90851 L1 858A ADAPTER Figure 2 3 SIP Adapters 2 9 ...
Page 50: ...INSTALLATION Figure 2 10 Three Cabinet System Front View With Covers Removed 2 26 ...
Page 51: ...INSTALLATION Figure 2 11 Position of Shorting Plugs on CPU Memory Circuit Pack 2 27 ...
Page 72: ...INSTALLATION UPPER ADAPTER MOUNTING CLIP Figure 2 18 Mounting Adapters ...
Page 85: ...INSTALLATION 2 61 ...
Page 92: ...INSTALLATION 2 68 ...
Page 103: ...INSTALLATION Figure 2 32 10B Emergency Transfer Unit 2 78 ...
Page 104: ...INSTALLATION Figure 2 33 Emergency Transfer Unit Connections 2 79 ...
Page 109: ...INSTALLATION Figure 2 35 Attendant Console With DXS Console 2 84 ...
Page 146: ...INSTALLATION 2 119b This page intentionally left blank November 1995 ...
Page 153: ...INSTALLATION This page intentionally left blank 2 124b November 1995 ...
Page 223: ...MAINTENANCE Figure 4 2 Clearing Supply Troubles Sheet 1 of 2 4 47 ...
Page 224: ...MAINTENANCE Figure 4 2 Clearing Power Supply Troubles Sheet 2 of 2 ...
Page 225: ...MAINTENANCE Figure 4 3 Clearing CO Trunk Troubles 4 49 ...
Page 226: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 1 of 4 4 50 ...
Page 227: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 2 of 4 4 51 ...
Page 228: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 3 of 4 4 52 ...
Page 229: ...MAINTENANCE Figure 4 4 Clearing 4 Wire Tie Trunk Troubles Sheet 4 of 4 4 53 ...
Page 231: ...Figure 4 6 Clearing Tie Trunk Troubles Sheet 1 of 5 4 55 ...
Page 232: ...MAINTENANCE 6 7 8 9 10 Figure 4 6 Clearing Tie Trunk Troubles Sheet 2 of 5 4 56 ...
Page 233: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 3 of 5 4 57 ...
Page 234: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 4 of 5 4 58 ...
Page 235: ...MAINTENANCE Figure 4 6 Clearing Tie Trunk Troubles Sheet 5 of 5 4 59 ...
Page 236: ...MAINTENANCE Figure 4 7 Clearing Paging Equipment Troubles ...
Page 250: ...MAINTENANCE Figure 4 9 System Cabinet Backplane Wiring Side Sheet 2 of 2 4 74 ...
Page 251: ...MAINTENANCE Figure 4 10 TDM Signal Designations on Cabinet Backplane 4 75 ...
Page 252: ...MAINTENANCE Figure 4 11 Power Designations on Cabinet Backplane 4 76 ...
Page 263: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 1 of 3 ...
Page 264: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 2 of 3 4 87 ...
Page 265: ...MAINTENANCE Figure 4 12 Clearing Virtual Facilities Troubles Sheet 3 of 3 4 88 ...
Page 271: ...MAINTENANCE Figure 4 13 Clearing Switched Loop Attendant Console Troubles Sheet 1 of 5 ...
Page 272: ...MAINTENANCE 4 13 Clearing Switched Loop 2 of 5 Console Troubles Sheet 4 95 ...
Page 273: ...MAINTENANCE Figure 4 13 Clearing Switched 3 of 5 Loop Attendant Console Troubles Sheet 4 96 ...
Page 274: ...MAINTENANCE 4 13 Clearing Switched 4 of 5 Console Troubles 4 97 ...
Page 321: ...APPENDIX E Administration Codes and Data This page is intentionally blank E 2 b ...