AD-WM-9080 Page 2 of 4
2. Adjust the horizontal alignment of the display arms (OPTIONAL)
1. Mount the Wall Mount Assembly to the wall
1
2
3
2.1.
Prior to mounting the display,
you may choose to adjust its final
horizontal alignment.
Use a Phillips head screwdriver
to remove the four Phillips head
screws from the arm assembly and
remove the security plates.
2.2.
Support the arm assembly and
horizontally slide it left or right
along the wall plate within the
allowable range - where the holes
on the arm assembly align with
those on the wall plate.
2.3.
Replace the security plates and
the four Phillips head screws,
ensuring the proper alignment
of the holes on the display arm
assembly, the wall plate and the
security plates.
NOTE:
• Lifting and securing of the wall mount should
be perfomed by two people.
• Use supplied drilling template
Z
to mark and
drill holes as required.
• Choice and supply of appropriate wall mount
fasteners is the responsibility of the installer.
• Consult a preferred fastener supplier or a
structural engineer to select fasteners which
are most appropriate for the weight of the
display and wall construction method.
• Wall mount
must
be level. Verify using a
quality spirit level tool.
• On a Stud Wall or Drywall use a good quality
Stud Finder to position mounting fasteners in
the centre of studs.
• On a Masonry Wall avoid positioning Wall
mount mounting fasteners in a mortar join.
Z
Slot Dimension
Ø8 x 34mm
*Fasteners shown for example only
A - FOR DISPLAYS WITH 100x100 TO 200x200 VESA SPACING
A3. Remove the horizontal VESA rails from the Wall Mount Assembly
A3.2.
Slide the rails out of the display mount assembly.
Save these for future display upgrades.
A3.1.
Use a Phillips head screwdriver to remove
the safety screws from the centre and at
least one side of each rail.