5.2.3 DC side voltage inspection
The DC side shall be connected to the inverter from the Combiner or DC distribution
cabinet.
Ensure correct DC input polarity.
Measure and record the DC voltage of each line. Voltages of each line shall be
similar, and less than the permitted maximum DC voltage value.
5.3 Power on steps
First power-on
First switched on PCS100 steps are as follow:
Step 1: Turn AC circuit breaker handle to "ON" position.
Step 2: Turn DC circuit breaker handle to "ON" position.
Step 3: After power on the system need to wait for about 30 seconds, the LCD will
display properly;
Step 4: Choose on-grid or off-grid mode on LCD screen
Step 5: At on-grid mode, set the output power in the range of -250kW to 250kW
Step 6: Inverter starts self-check, connect to grid or local load when self-check
completed successfully.
Automatic power-on
When the dc side and ac side meet boot conditions, energy storage controller
automatically switched on.
When the input dc or ac power grid after fault clearance, storage controller will
automatically boot.
Manual power-off
In operation process of the inverter, it can be powered off by clicking "OFF" button
on the screen. At this moment, the inverter stops working.
CAUTION!
After manual power-off, the machine must be powered on
manually, otherwise the inverter is unable to power on.
5.4 Pilot operation completion
The following procedures shall be carried out after the inverter is normally in
operation.
Procedure 1:
Inspect whether abnormity exists in the inverter, such as excessive
noise, excessive heat, abnormal smell or smoke.
Procedure 2:
Measure whether inverter voltage, current and THD are stable.
Procedure 3:
Operate LCD control panel and inspect whether it displays normally
and accurately.
By now, the pilot operation of inverter is fully completed, and we can enter the daily
operational maintenance.
5.5 Power off steps
CAUTION!
After the inverter is completely powered off, the general DC
switch at battery side and the Grid switch at grid side still maintain
voltage. If operations are needed, please be sure to cut off the
outer power completely, and wait for not less than 5 minutes.
1. Click the OFF button on LCD;
2. Cut off DC SWITCH;
3. Cut off GRID SWITCH;
4. Cut off the switch of DC distribution cabinet or combiner;
5. Cut off the switch of AC distribution cabinet.