Load chain inspection

The load chain has to be inspected for me-

chanical defects annually, however, latest af-

ter 50 hours of operation.

The load chain has to be checked for visual

damages, deformations, cracks, corrosion

marks, wear and sufficient lubrication.

Link chains have to be replaced, when the

original nominal dimension ´d´ at the strong-

est worn chain link has been reduced by more

than 10% or when the chain has experienced

an elongation of 5% (Fig. 13) over a pitch

´pn´, or an elongation of 3 % over 11 pitches

(11 x pn). The nominal values and wear limits

are given in table 2. When exceeding one of

the limit values, the load chain has to be re-

placed.

Chain stop inspection

The chain end stop must be connected to the

free (idle) chain strand (Fig. 11). Abrasion resp.

false position must not be available.

Chain reeving inspection

Bottom block

All units equipped with two or more chain falls,

should be inspected prior to being put into

operation for twisted or kinked chains. The

chains of multiple fall hoists may be twisted if

the bottom block was turned over (Fig. 9).

The load chain has to be installed correctly

according to illustration (Fig. 10). Hereby the

welds of the standing links must face away

from the load sheave.

Make sure that load chains are installed which

have been approved by the manufacturer only.

In case of non-compliance the warranty will

be void with immediate effect.

Inspection of load brake (Fig. 15)

In case of irregularities (e.g. bloomed cooling

element, loosened friction discs) consult the

manufacturer immediately.

All brake components must be inspected for

wear, damage, staining by overheating and

function. Friction discs must be kept clean

from oil and grease as well as water and dirt.

The bonding of the friction discs has to be

checked.

The brake adjustment should be made in ac-

cordance with the maintenance instruction no.

09900490/09.2006.

Works survey

Every 3 years each unit should be examined

by Yale Industrial Products GmbH. This inspec-

tion includes the complete disassembly of the

unit and the perfect inspection of all compo-

nents. Non-compliance with this inspection by

Yale Industrial Products GmbH will render the

ATEX declaration of conformity nil and void.

Inspections and the compliance with

the inspection intervals are the
responsibility of the user.

Summary of Contents for Towerlift

Page 1: ...25 C X II 2 GD c IIB T3 T 145 C Betriebs und Wartungsanleitung f r explosionsgesch tzte Hebezeuge Richtlinie 94 9 EG ATEX 95 Operating and Maintenance Instruction for explosion proof hoisting equipmen...

Page 2: ...ungsgem en Verwendung in der allgemeinen Industrie wie folgt eingestuft werden Yalelift 0 5t II 2 GD c IIB T4 T 105 C X Yalelift 1 0t II 2 GD c IIB T4 T 125 C X Yalelift 2 0t II 2 GD c IIB T4 T 125 C...

Page 3: ...t noch durch das Tragmittel oder die Last gef hrdet wird Das Ger t kann bei einer Umgebungs temperatur zwischen 10 C und 40 C arbeiten Bei Extrembedingungen sollte mit dem Hersteller R cksprache genom...

Page 4: ...toff Bremsgewinde Teccem e K 708W Plus Neu Kettenschmierung Shell Tonna T68 Rocol M070 MV 3 Getriebe und Lagersitzschmierstoff Gleitmo 805K Tropfpunkt 130 C PR FUNG VOR DER ERSTEN INBETRIEBNAHME Vor d...

Page 5: ...d and main tained according to the instructions The user is committed to ensure safe and trouble free operation of the product TEMPERATURE LIMITS IN EXPLOSIVE ATMOSPHERES AND DUSTS In order to determi...

Page 6: ...tion A competent person is a person with profes sional training experience and actual opera tion to provide the necessary expertise for the inspection of material handling equipment Check brake functi...

Page 7: ...Yale works certificate of compliance Also consult the maintenance and inspection intervals on page 17 Spare parts Repairs may only be carried out by specialist workshops that use original Yale spare...

Page 8: ...turned over Fig 9 The load chain has to be installed correctly according to illustration Fig 10 Hereby the welds of the standing links must face away from the load sheave Make sure that load chains a...

Page 9: ...9 Fig 6 Fig 7 Fig 9 Fig 8 Fig 1 Fig 5 Fig 2 Fig 3 Fig 4 S Bestimmungsgem e Verwendung Correct operation D GB Sachwidrige Verwendung Beispiele Incorrect operation Examples D GB...

Page 10: ...10 Fig 10 Yalelift 5t Yalelift 0 5 3t Yalelift 10t Yalelift 20t Towerlift 1 2 t Kettenverlauf Chain reeving D GB Yalelift LH 5t Yalelift LH 0 5 3t...

Page 11: ...nzug mit integriertem Fahrwerk Modell YLITG Chain hoist with integrated trolley Model YLITG Flaschenzug mit integriertem Fahrwerk Modell YLLHP Chain hoist with integrated trolley Model YLLHP 5 Fig 11...

Page 12: ...nabmessung Chain dimensions Anschrift Address Baujahr Mfg year Hubh he Lift Schutzkennzeichnung Indification of classification Serien Nr Serial No X d Nenndicke der Kette Nominal thickness of chain d1...

Page 13: ...eder Bremsscheibe mit aufgeklebter Friktionsscheibe K hlk rper Cooling element Druckscheibe mit aufgeklebter Friktionsscheibe Bushing with spring Thrust washer with bonded friction disc Brake disc wit...

Page 14: ...30 T 10 x 30 V 10 x 30 V Abhaspelung der Handkette je 1 m Hub Hand chain overhaul for 1 m lift m 30 49 71 87 174 261 522 Enroulement de la cha ne de manoeuvre pour 1 m de lev e Hub je 1 m Abhaspelung...

Page 15: ...30 10 x 30 10 x 30 10 x 30 G teklasse Grade T T T T T V V d nom mm 5 0 6 0 8 0 10 0 10 0 10 0 10 0 Durchmesser Dia d min mm 4 5 5 4 7 2 9 0 9 0 9 0 9 0 p n nom mm 15 0 18 0 24 0 30 0 30 0 30 0 30 0 Te...

Page 16: ...0 5 1 1 1 2 1 3 1 5 2 10 3 20 6 Haken ffnungsma a nom mm 30 36 43 50 55 78 84 Hook opening Haken ffnungsma amax mm 33 40 47 55 61 86 92 Hook opening Ma Hakenbreite b mm 13 18 24 38 45 50 56 Hook width...

Page 17: ...function Last und alle 6 Monate siehe Abschnitt Traghaken pr fen mindestens einmal j hrlich berpr fung des Trag und Lasthakens Check top every 6 months see para and bottom hooks at least annually Ins...

Page 18: ...20 000 kg Serien Nr ab Baujahr 05 08 Seriennummernkreise f r die einzelnen Tragf higkeiten werden datentechnisch erfasst Einschl gige EG Richtlinien EG Maschinenrichtlinie 2006 42 EG 98 37 EG ATEX Ric...

Page 19: ...the individual capacities are registered in the production book Relevant EC Directives EC Machinery Directive 2006 42 EC 98 37 EC ATEX Directive 94 9 EC Transposed standards in particular ISO 12100 1...

Page 20: ...vision of Columbus McKinnon Corporation Ltd Unit 12 Loughside Industrial Park Dargan Crescent Belfast BT3 9JP Phone 00 44 0 28 907714 67 Fax 00 44 0 28 90 771473 Web Site www yaleproducts com E mail s...

Reviews: