® Copyright ATH-Heinl GmbH & Co. KG, 2012, All rights reserved. / Misprints and technical changes reserved / Issue: 04/2014
17
2. Installation and connection of the hydraulic aggregate
a. Fix the hydraulic aggregate on the left front column
b. Make now the hydraulic connection to the cylinder by means of the hydraulic hose and oil leakage pipe.
You can find the hydraulic diagram in the appendix of this user´s manual
3. Pneumatic connection
Connect the electromagnetic pneumatic valve, which is in the front cross beam, to the compressed air supply.
With this valve the pneumatic cylinder for unlocking the safety notches will be controlled.
You can find the pneumatic diagram in the appendix of this user´s manual
4. Electrical connection
Herewith the general as well as the local regulations have to be observed. Therefore only skilled personal is
allowed to make this work.
Pay attention to the necessary supply lines (see technical data).
You can find the electric diagram in the appendix of this user´s manual
5. Hydraulic oil
Fill up the hydraulic oil until the mark on the dipstick
6. Adjusting work before fixing the lift
a. Check all screws, nuts and so on that they are tight
b. Check all connections and cylinders for leak and retighten if necessary
c. Pay attention to the rotating direction of the motor; while pushing the button LIFTING the fan must rotate
in the indicated direction. If necessary the direction of rotation must be changed.
For the following points all columns must be observed carefully during the whole process.
d. Push again the button UP, after a short time the cylinder fills and clamps the lifting ropes. Raise the lift
until the cross beams are appr. 50 mm over the support frames resp. squared-timber.
e. Check the diagonals (see D1/D2 in the dimensional drawing of the technical data). Following the columns
will be aligned to the cross beam by means of a water-level.
f. As a security there will be fixed on each column a safety anchor as described in point 7.
g. Now the support frames resp. squared-timber can be removed.
h.
Lower the lift with the button „
DOWN
“ in the lowest position.
i. Check now again the position of the columns and fix the remaining safety anchors as described in the
next point.