® Copyright ATH-Heinl GmbH & Co. KG, 2019, All rights reserved / Misprints and technical changes reserved / As of: 2019-03
Manufacturer ATH-Heinl GmbH & CO.KG
- 24 -
2.9
Assembly
These instructions are not to be viewed as assembly instructions; hints and tips are
provided only for trained expert installers. Suitable clothing and personal protection must
be worn for the following work.
Incorrect installation and settings lead to exclusion of liability and warranty.
Partly pre-assembled machines must be checked, introduced and approved by a competent person before
commissioning.
Machine assembly must be carried out by a qualified and competent person.
2.9.1.
Setting up the balancing machine
a.
Remove the balancing machine from the shipping pallet. Use the support points that are
specially designed for this purpose to do this. Under no circumstances should the machine
be lifted on other points, e.g. the shaft, the display or the accessory panel.
b.
The machine must be firmly positioned on the ground using the special support points and,
if necessary, washers must be used.
2.9.2.
Fixing with safety anchor
Drill holes, observing the necessary drill depth A
and drill diameter of the dowel manufacturer.
Clean out the inside of the holes.
Insert the anchor bolts into the holes up to the
appropriate depth.
Tighten the nuts to the torque specified by the
manufacturer.
Clamping thickness B varies depending on the
floor covering.
The balancing machine must be anchored on the floor in order to achieve a precise balancing result.