118
6.2.2
Visual and structural inspection
Visually check the following points according to the schedule indicated in the
general chart. Immediately inform a maintenance technician if faults are
discovered.
•
Integrity of the railings of the work platform
•
Condition of ladder
•
Condition of lifting structure (scissors)
•
Condition of the frame
•
Status of the bi-levelling structure and of the tracked chassis
•
In particular check if there is any rust in the structure
•
Status of the rubber tracks
•
Oil leaks
•
Pins and their stop devices
6.2.3
Damage to tubes and cables
Visually check at the frequencies indicated in the general chart to make sure
that the articulation point of the hydraulic hoses and electric cables are not
misshapen or damaged. Examples of such faults are shown on the photos below.
Damaged hydraulic hose pipe
Damaged electric cable
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...