133
6.2.12
Checking the operation of the scissor angle sensor
With the frequency indicated in the general chart, check the scissor angle
sensor.
•
Lift the platform to a height greater than the transport height, check that
the manual levelling functions are not allowed.
•
Check the operation of the anti-shearing device; this test is performed by
lifting the platform to a height that involves an angle of the scissor
frames greater than 12° with respect to the horizontal and make sure
that the descent movement stops automatically at a scissor angle
between 7° and 9° (the vertical distance between the ends of the scissors
must be greater than 50mm). Further movements downwards are possible
only after a 3s delay at reduced speed.
•
Check the operation of the travel function with the platform lifted; this
test is performed by lifting the platform to a height that involves an angle
of the scissor frames of 23° with respect to the horizontal (maximum
height of transit area 4.5mt) and make sure that it is possible to travel
with the machine only at reduced speed (light indicator 2 flashing ). Also
make sure that at greater heights the light indicator (2) turns off and that
it is not allowed to move.
If the operations described above take place in the indicated sequence, it
means that the angle sensor is working properly.
Warning: if the conditions indicated above are not met, do not use the machine
and contact a qualified technician trained by Almac Srl
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...