138
6.2.17
Checking the operation of the
“
Proactive levelling
”
safety valves
With the frequency indicated in the general chart, check the additional levelling
locking valves.
Remove the connectors from the solenoid valves and try to perform manual
levelling operations with the machine in the transport position.
All the movements must be prevented and the maximum pressure relief valves
of the hydraulic block will be activated.
Warning: At the end of the test, restore the connectors as before.
Warning: if the conditions indicated above are not met, do not use the machine
and contact a qualified technician trained by Almac Srl
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...