181
Checking and tightening screws, bolts, plug ring nuts
Visual and structural inspection
__________________________________________ 118
______________________________________________ 118
____________________________________________________ 119
Greasing the nylon wheels of the platform extension
Checking the hydraulic tank oil level and topping up if necessary
Hydraulic reservoir oil change
____________________________________________ 123
Checking the operation of the maximum pressure valves
________________________________________________________________ 125
__________________________________________________________ 125
______________________________________________________________ 126
________________________________________________________________ 126
Charging method No. 1 with 12V battery charger ________________________________ 126
Charging method No. 2 using the 230V plug in the ladder _________________________ 127
Charging method No. 3 using the internal combustion engine ______________________ 128
___________________________________________ 129
_________________________________________________ 129
________________________________________________ 130
Checking the operation of the frame angle sensor
Checking the operation of the scissor angle sensor
Checking the operation of the Proactive levelling redundant angle sensor
Checking the differential circuit breaker
________________________________ 135
Electrical insulation monitoring device operation test
Manual emergency device operation test
________________________________ 137
Checking the seal of the cylinder balancing valves
Procedure with remote controller for checking the seal of the cylinder balancing
_____________________________________________ 143
Track inspection and tensioning
________________________________________ 153
__________________________________________ 154
__________________________________________________ 155
Track reduction gear oil level inspection
________________________________ 157
DEMOLITION _________________________________________________________________ 158
_______________________________________________________________ 158
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...