37
that no functions are allowed. Release the mushroom-shaped button after this
test.
•
Operate the warning buzzer and make sure it works.
•
Check the operation of the buzzer when the travel or work platform descent
functions are used.
•
Make sure, with the machine travelling and the platform in the transport
position (with travel selector on DM) that, when the Joysticks are released,
the machine stops immediately.
•
Make sure that the manual emergency descent device works properly.
•
Make sure that the platform extension can move freely and that the pedal
blocks it safely
•
Make sure that the folding railings are correctly positioned and secured
2.11
Precautions when work terminates or is interrupted
It is forbidden
to leave the MEWP unattended without having first stopped the
engine and removed the keys from the control panel to prevent the machine
from being used by unauthorized persons
2.12
Safety regulations during maintenance
The maintenance operations described in this Manual refer to platforms in
conditions of normal use. In heavy duty use conditions (e.g. extreme
temperatures, dust and corrosive substances in the environment, etc.), inform
the ALMAC S.r.l. assistance services to have the maintenance intervals checked
and changed.
The MAINTENANCE operations must only be performed by authorized and
adequately trained personnel.
Only perform the MAINTENANCE and ADJUSTMENT operations described in this
Manual. Contact the ALMAC S.r.l. assistance service only, if other operations are
required (e.g. if faults occur).
All MAINTENANCE work must be performed in compliance with the laws in force
governing safety and protection of the environment.
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...