85
gates with a height below 2
m.
8
•
Should it be required to
transport the machine, it is
necessary
to
close
the
expandable part up to the "T"
lock.
Unlocking the railing fastenings
To unlock the railing fastenings, it is necessary to:
1)
Turn the safety catch (
A
) of the locking pin (
B
) and then pull it from its seat
2)
Remove the safety screw (
C
)
3)
Once you have extracted all fastenings of the railings, is possible to fold it
according to the instructions in the previous pages
Summary of Contents for 1090 EVO
Page 7: ...7...
Page 22: ...22...
Page 23: ...23...
Page 49: ...49 37 Combustion engine 38 Fuel tank 39 Bi levelling chassis 37 38...
Page 78: ...78...
Page 80: ...80...
Page 122: ...122 In this configuration the oil level must be as shown in the figure below A 60mm...
Page 144: ...144...
Page 145: ...145...
Page 146: ...146...
Page 147: ...147...
Page 148: ...148...
Page 149: ...149...
Page 150: ...150...
Page 151: ...151...
Page 152: ...152...
Page 161: ...161 8 ATTACHMENTS 8 1 Declaration of conformity...
Page 163: ...163 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 177: ...177 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...