Manual warning buzzer
Use the button on the push-button to operate the platform buzzer. It must be
used whenever persons working or moving around the platform area must be
warned that platform movements are in progress.
Warning: The continuous use of this device reduces the battery charge.
4.3
Warnings for the operator by means of the indicator lights on the
control push-button panels
In general, the indicator lights of the push-button panel, as well as indicating
the function described on the push-button panel itself, also indicate, when
combined with other indicator lights, the following general situations:
Planarity alarm flashing: At least one but not all stabilisers are on the ground
OK Work flashing and buzzer: At least one pin of the stabilisers is not inserted.
OK Work flashing and buzzer: At least one pin of the stabilisers is not inserted.
All indicator lights on and buzzer: The electronic control unit of the machine is
starting
All indicator lights off: The electronic control unit of the machine is not
powered
All indicator lights flashing and buzzer: One of the machine components is not
connected (Limit switch, pressure transducers, angle sensors, KM4 relay) or the
can bus network is interrupted.
Check any alarms on the timer.
Specifically, depending on the machine configuration, the indicator lights on the
work platform describe the following situations:
Summary of Contents for 1470-HE EVO
Page 7: ...PAGE 7...
Page 12: ...PAGE 12 Work area on tracks Travel not allowed Maximum inclination allowed 2 5020 5490 7500...
Page 27: ...PAGE 27...
Page 28: ...PAGE 28...
Page 34: ...PAGE 34 Warning Do not tighten the fixing belts too much so as not to damage the eye bolts...
Page 50: ...PAGE 50 8 Extendible basket pedal...
Page 57: ...PAGE 57 38 Chassis and stabilisers...
Page 74: ...PAGE 74...
Page 76: ...PAGE 76...
Page 77: ...PAGE 77...
Page 80: ...PAGE 80...
Page 138: ...PAGE 138...
Page 160: ...PAGE 160...
Page 161: ...PAGE 161...
Page 162: ...PAGE 162...
Page 163: ...PAGE 163...
Page 164: ...PAGE 164...
Page 165: ...PAGE 165...
Page 166: ...PAGE 166...
Page 167: ...PAGE 167...
Page 168: ...PAGE 168...
Page 178: ...PAGE 178 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 191: ...PAGE 191 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...