PAGE
92
4.1.7
Folding the railings
The platform is provided with folding railings which facilitate the transport and
the passage inside vehicles. To perform the folding, unlock the pins located on
every railing according to a pre-determine sequence.
1
•
Extend the work platform
according to the instructions
given in sect.
4.1.4 Extending
the work platform
until it has
been fully extended
2
•
Remove the remote push-
button
•
Unlock the fastenings of the
front railing (see following
pages)
•
Fold the railing according to
the figure
3
•
Unlock the fastenings of the
RH railing of the expandable
work platform
•
Fold the railing according to
the figure
4
•
Unlock the fastenings of the
LH railing of the expandable
work platform
•
Fold the railing according to
the figure
Summary of Contents for 1470-HE EVO
Page 7: ...PAGE 7...
Page 12: ...PAGE 12 Work area on tracks Travel not allowed Maximum inclination allowed 2 5020 5490 7500...
Page 27: ...PAGE 27...
Page 28: ...PAGE 28...
Page 34: ...PAGE 34 Warning Do not tighten the fixing belts too much so as not to damage the eye bolts...
Page 50: ...PAGE 50 8 Extendible basket pedal...
Page 57: ...PAGE 57 38 Chassis and stabilisers...
Page 74: ...PAGE 74...
Page 76: ...PAGE 76...
Page 77: ...PAGE 77...
Page 80: ...PAGE 80...
Page 138: ...PAGE 138...
Page 160: ...PAGE 160...
Page 161: ...PAGE 161...
Page 162: ...PAGE 162...
Page 163: ...PAGE 163...
Page 164: ...PAGE 164...
Page 165: ...PAGE 165...
Page 166: ...PAGE 166...
Page 167: ...PAGE 167...
Page 168: ...PAGE 168...
Page 178: ...PAGE 178 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 191: ...PAGE 191 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...