PAGE
128
6
Maintenance
6.1
General maintenance
The main maintenance interventions and the frequencies with which they must
be carried out are given in the chart below.
6.1.1
Ordinary maintenance schedule table
The checks and maintenance operations must be performed as indicated in the
table below
ORDINARY MAINTENANCE SCHEDULE TABLE
A
B
C
D
E
F
G
H
10 50 100 250 500 1500
Visual and functional checks as specified
X
X
Discharge filter cartridge replacement
X
X
Suction filters replacement
X
X
Check and, if necessary, grease the runners and nylon wheels
X
X
X
Check the hydraulic oil level
X
X
Change the hydraulic oil
X
Track reduction gear oil level inspection
X
X
Replace oil in the track reduction gear
X
Check the oil level in the engine
X
X
Change the motor oil * (after the first 20 hours)
X
Replace engine oil filter.*
X
X
Clean the engine air filter.*
X
X
Replace engine air filter.*
X
Track inspection and tensioning
X
X
Check the condition of the tracks
X
X
Check the runners for wear
X
Check the tightening of nuts and bolts (general checks)
X
Check using a torque wrench the tightening of screws and bolts
for fixing of the tracked chassis to the machine frame, the
screws M16 class8.8 tightening torque 193 Nm (after the first
50 hours)
X
Check the correct positioning of the Seeger rings of the
scissors and their washers
X
X
Structural inspection (visual)
X
X
X
Structural inspection (through checking of metal parts and
welds)
X
X
Check the overload monitoring device
X
Manual emergency devices
X
X
Check the combustion engine battery
X
X
Check the correct operation of the 230V outlet differential
X
X
Check and replace the fuses
X
X
Check the maximum pressure valve
X
Check the main system angle sensors
X
X
Check the correct operation of the Sentinel
X
Summary of Contents for 1470-HE EVO
Page 7: ...PAGE 7...
Page 12: ...PAGE 12 Work area on tracks Travel not allowed Maximum inclination allowed 2 5020 5490 7500...
Page 27: ...PAGE 27...
Page 28: ...PAGE 28...
Page 34: ...PAGE 34 Warning Do not tighten the fixing belts too much so as not to damage the eye bolts...
Page 50: ...PAGE 50 8 Extendible basket pedal...
Page 57: ...PAGE 57 38 Chassis and stabilisers...
Page 74: ...PAGE 74...
Page 76: ...PAGE 76...
Page 77: ...PAGE 77...
Page 80: ...PAGE 80...
Page 138: ...PAGE 138...
Page 160: ...PAGE 160...
Page 161: ...PAGE 161...
Page 162: ...PAGE 162...
Page 163: ...PAGE 163...
Page 164: ...PAGE 164...
Page 165: ...PAGE 165...
Page 166: ...PAGE 166...
Page 167: ...PAGE 167...
Page 168: ...PAGE 168...
Page 178: ...PAGE 178 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 191: ...PAGE 191 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...