PAGE
175
7 Demolition
7.1
Machine life
The machine has been designed to work for 10 years in normal operating
environments considering proper use and correct maintenance.
7.2
Decommissioning and demolition
Once the machine has reached the end of its technical and operational life, it
must be subjected to a detailed and complete inspection/review by the
manufacturer or specialised and qualified technicians. If the test does not have
a positive outcome, the equipment must be deactivated and demolished. The
machine must be reduced to conditions in which it can no longer be used for the
purposes for which it was designed and built. In addition, the raw materials used
to make it must be recovered for recycling purposes where possible.
Note: ALMAC S.r.l. declines all liability for damage to persons, animals or things
deriving from reuse of parts of the equipment for functions or assembly
situations differing from the original ones.
Danger: Machine decommissioning and demolition must be carried out only by
properly trained and equipped personnel.
The machine must be demolished following the adoption of safety measures that
must take account of the logistic, environmental and wear conditions of the
machine itself.
Comply with the following general rules:
•
wear approved protective clothing and accessories (hard-hat, safety
footwear, gloves, goggles and face mask if necessary) in accordance with
the accident-prevention laws in force.
•
Disconnect the machine from all power sources.
•
Check and, if necessary, relieve the pressure from pressurized systems.
Summary of Contents for 1470-HE EVO
Page 7: ...PAGE 7...
Page 12: ...PAGE 12 Work area on tracks Travel not allowed Maximum inclination allowed 2 5020 5490 7500...
Page 27: ...PAGE 27...
Page 28: ...PAGE 28...
Page 34: ...PAGE 34 Warning Do not tighten the fixing belts too much so as not to damage the eye bolts...
Page 50: ...PAGE 50 8 Extendible basket pedal...
Page 57: ...PAGE 57 38 Chassis and stabilisers...
Page 74: ...PAGE 74...
Page 76: ...PAGE 76...
Page 77: ...PAGE 77...
Page 80: ...PAGE 80...
Page 138: ...PAGE 138...
Page 160: ...PAGE 160...
Page 161: ...PAGE 161...
Page 162: ...PAGE 162...
Page 163: ...PAGE 163...
Page 164: ...PAGE 164...
Page 165: ...PAGE 165...
Page 166: ...PAGE 166...
Page 167: ...PAGE 167...
Page 168: ...PAGE 168...
Page 178: ...PAGE 178 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 191: ...PAGE 191 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...