PAGE
195
Moving the machine (Forwards or backwards)
_____________________________________ 127
_________________________________________________________________ 128
________________________________________________________ 128
Ordinary maintenance schedule table
_____________________________________ 128
__________________________________________________ 130
________________________________________________________ 133
Checking and tightening screws, bolts, plug ring nuts
Visual and structural inspection
__________________________________________ 134
______________________________________________ 134
____________________________________________________ 135
Checking the hydraulic tank oil level and topping up if necessary
Hydraulic reservoir oil change
____________________________________________ 139
Checking the operation of the maximum pressure valves
________________________________________________________________ 142
__________________________________________________________ 142
______________________________________________________________ 142
________________________________________________________________ 142
Charging method No. 1 with 12V battery charger
____________________________ 143
Charging method No. 2 using the 230V plug in the ladder
Charging method No. 3 using the internal combustion engine
_____________________________________________ 145
_________________________________________________ 146
________________________________________________ 146
__________________________________________________ 148
Greasing the nylon wheels of the platform extension
Checking the operation of the frame angle sensor
Checking the operation of the scissor angle sensor
Checking the differential circuit breaker
________________________________ 152
Electrical insulation monitoring device operation test
Manual emergency device operation test
________________________________ 154
Checking the seal of the cylinder check valves
___________________________ 155
Checking the seal of the stabiliser cylinder check valves
Checking the seal of the lifting cylinder check valves
___________________________ 156
_____________________________________________ 159
Track inspection and tensioning
________________________________________ 169
Summary of Contents for 1470-HE EVO
Page 7: ...PAGE 7...
Page 12: ...PAGE 12 Work area on tracks Travel not allowed Maximum inclination allowed 2 5020 5490 7500...
Page 27: ...PAGE 27...
Page 28: ...PAGE 28...
Page 34: ...PAGE 34 Warning Do not tighten the fixing belts too much so as not to damage the eye bolts...
Page 50: ...PAGE 50 8 Extendible basket pedal...
Page 57: ...PAGE 57 38 Chassis and stabilisers...
Page 74: ...PAGE 74...
Page 76: ...PAGE 76...
Page 77: ...PAGE 77...
Page 80: ...PAGE 80...
Page 138: ...PAGE 138...
Page 160: ...PAGE 160...
Page 161: ...PAGE 161...
Page 162: ...PAGE 162...
Page 163: ...PAGE 163...
Page 164: ...PAGE 164...
Page 165: ...PAGE 165...
Page 166: ...PAGE 166...
Page 167: ...PAGE 167...
Page 168: ...PAGE 168...
Page 178: ...PAGE 178 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 191: ...PAGE 191 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...