PAGE
32
•
USE OF THE PLATFORM ALWAYS REQUIRES 2 OPERATORS, ONE OF WHOM
ON THE GROUND and able to perform the emergency operations described
in this Manual.
•
The platform must not be used if there is insufficient light, since it is not
fitted with its own lights.
•
The control box in the work platform must always be protected with the
casing supplied if it rains or when the machine is parked.
2.5
Transport and loading
You are advised to check the dimensional limits established for means of
transport if the machine must be transported to its specific work site.
The machine can be loaded onto the vehicle in two different ways:
1)
Using chutes and the platform driving controls
: after having fully LOWERED
the platform, the operator can operate the machine by following the
instructions given in the dedicated chapter, driving directly onto the
transport means.
In this case,
make sure that the ramp gradient is within the
gradeability indicated in the PERFORMANCE data and that the bearing
capacity of the chutes suits the weight of the machine.
The mobile push-button panel can be removed, and the machine can be
driven with the operator on the ground:
with the platform in the transport
position, the operator can move the machine directly from the ground using the
portable push-button panel.
Summary of Contents for 1470-HE EVO
Page 7: ...PAGE 7...
Page 12: ...PAGE 12 Work area on tracks Travel not allowed Maximum inclination allowed 2 5020 5490 7500...
Page 27: ...PAGE 27...
Page 28: ...PAGE 28...
Page 34: ...PAGE 34 Warning Do not tighten the fixing belts too much so as not to damage the eye bolts...
Page 50: ...PAGE 50 8 Extendible basket pedal...
Page 57: ...PAGE 57 38 Chassis and stabilisers...
Page 74: ...PAGE 74...
Page 76: ...PAGE 76...
Page 77: ...PAGE 77...
Page 80: ...PAGE 80...
Page 138: ...PAGE 138...
Page 160: ...PAGE 160...
Page 161: ...PAGE 161...
Page 162: ...PAGE 162...
Page 163: ...PAGE 163...
Page 164: ...PAGE 164...
Page 165: ...PAGE 165...
Page 166: ...PAGE 166...
Page 167: ...PAGE 167...
Page 168: ...PAGE 168...
Page 178: ...PAGE 178 MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature...
Page 191: ...PAGE 191 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment...