PAGE
182
ALMAC s.r.l.
Checking and tightening screws, bolts, plug ring nuts
Visual and structural inspection
__________________________________________ 118
______________________________________________ 118
____________________________________________________ 119
Greasing the nylon wheels of the platform extension
Checking the hydraulic tank oil level and topping up if necessary
Hydraulic reservoir oil change
____________________________________________ 123
Checking the operation of the maximum pressure valves
________________________________________________________________ 126
__________________________________________________________ 126
______________________________________________________________ 126
________________________________________________________________ 126
Charging method No. 1 with 12V battery charger ________________________________ 127
Charging method No. 2 using the 230V plug in the ladder _________________________ 127
Charging method No. 3 using the internal combustion engine ______________________ 128
___________________________________________ 129
_________________________________________________ 129
________________________________________________ 131
Checking the operation of the frame angle sensor
Checking the operation of the scissor angle sensor
Checking the operation of the Proactive levelling redundant angle sensor
Checking the differential circuit breaker
________________________________ 135
Electrical insulation monitoring device operation test
Manual emergency device operation test
________________________________ 137
Checking the seal of the cylinder balancing valves
Procedure with remote controller for checking the seal of the cylinder balancing
_____________________________________________ 143
Track inspection and tensioning
________________________________________ 153
__________________________________________ 154
__________________________________________________ 155
Track reduction gear oil level inspection
________________________________ 157
DEMOLITION _________________________________________________________________ 160
_______________________________________________________________ 160
Summary of Contents for 850-BL EVO
Page 7: ...PAGE 7 ALMAC s r l MAXIMUM WORKING HEIGHT TRAVELLING NOT PERMITTED H1 H2 G3 H3 H4 G4 G1 L1 G2 ...
Page 10: ...PAGE 10 ALMAC s r l ...
Page 23: ...PAGE 23 ALMAC s r l ...
Page 49: ...PAGE 49 ALMAC s r l 35 Combustion engine 36 Fuel tank 37 Bi levelling chassis 37 38 ...
Page 78: ...PAGE 78 ALMAC s r l ...
Page 80: ...PAGE 80 ALMAC s r l ...
Page 144: ...PAGE 144 ALMAC s r l ...
Page 145: ...PAGE 145 ALMAC s r l ...
Page 146: ...PAGE 146 ALMAC s r l ...
Page 147: ...PAGE 147 ALMAC s r l ...
Page 148: ...PAGE 148 ALMAC s r l ...
Page 149: ...PAGE 149 ALMAC s r l ...
Page 150: ...PAGE 150 ALMAC s r l ...
Page 151: ...PAGE 151 ALMAC s r l ...
Page 152: ...PAGE 152 ALMAC s r l ...
Page 159: ...PAGE 159 ALMAC s r l ...
Page 162: ...PAGE 162 ALMAC s r l 8 ATTACHMENTS 8 1 Declaration of conformity ...
Page 164: ...PAGE 164 ALMAC s r l MANDATORY ROUTINE INSPECTIONS Date Observations Seal Signature ...
Page 178: ...PAGE 178 ALMAC s r l 8 4 Hydraulic diagram See attachment 8 5 Wiring diagram See attachment ...