ENG
33
MANUAL
Congratulations on your purchase of Atlantis OnLine Double Conversion Tower UPS.
This manual discusses how to install and use this device.
1.0 UPS
This manual contains important safety instructions. Please follow all instructions
carefully during installation. Read this manual thoroughly before attempting to
unpack, install or operate.
1.1 Inspection
Inspect the UPS upon receipt. Notify the carrier and dealer if there is damage. The
package is recyclable; save it for reuse or dispose of it properly.
For safety consideration, the UPS is shipped out from
factory without connecting battery wires. Before install
the UPS, please follow below steps to re-connect battery
wires first.
1.2 Package Contents
Make sure that you have the following items :
LinePower On-Line Double Conversion Tower UPS
Connection cable
Manual (Eng, Ita)
WEEE Instructions & Warranty
If any of the above items are missing, please contact your reseller.
1.3 Placement
To prevent the risk of fire or electric shock, install in a temperature and humidity
controlled indoor area, free of conductive contaminants.
This UPS system is designed for indoor use only.
Do not install the UPS under direct sunlight. Your warranty will be void if the
batteries fail due to overheating.
Install in a temperature and humidity controlled indoor area