background image

Any revisions must first be approved by the product designer.  Version: 201909 

Revision By:  JST 

 

9.

 

CRITICAL SEAL 

Remove dust and dirt first. Seal the connection 
between the glass receiver channel and the base 
glazing channel with clear silicon prior to the 
installation of panel 

20 B. 

 

Ensure the corner junction between wall 
channel 
and 

base channel 
is full of 
silicon before 
final glass                            
placement. It 
is vital that all 
junctions are 
sealed 
sufficiently.  
Prior to installation of glass panels and infill use 
the clear silicon supplied 

 
 

10.

 

INSTALLATION OF FIXED PANEL 

 
Locate the glass panel 

20MG-F 

into the glazing 

channel. Add or remove plastic packers (

BAG11

)  

in the base 
glazing 
channel as 
necessary.  
This panel 
must 
protrude 
23mm above 
the wall 
channel. 

 

11.

 

INSTALLATION OF THE RETURN PANEL.

 

Locate the glass panel 

20 B 

into the glazing 

channel.  Adjust height of panel if necessary by 
adding or removing plastic packers (bag11) in 
the base glazing channels.  
 
 
 
 
 
 

12.

 

GLASS DOOR / TOP TRACK ASSEMBLY 

 

Before proceeding check the length of the 
supplied top track is correct.  The top track 
should fit between the wall and 

20 B 

glass 

return panel and be the same measurement top 
and bottom. 

The next processes are easily achieved when the 
door is laying flat on clean saw horses.  
Alternatively use clean 50mm timber blocks on 
the floor.  
 

HANGER ASSEMBLY  

 The bolts on the 
hangers must be 
facing inside the 
shower.  Ensure 
the direction of 
the door is 
correct.  Fit 2x 
hangers to the 
door (note clear 
gaskets fit 1x 
inside, 1x 
outside).

 

 

 
 
 
 
 
 
 
 
 

13.

 

SLIDING ASSEMBLY TO HANGER SET

 

Fit the idle rollers (sliding mechanisms) to the 
hangers using 4mm hex key.   The single wheel 
must face to the outside of the glass door.  
 
 
 
 
 
 
 
 
 
 
 

Summary of Contents for miGLIDE MG2-SMALL

Page 1: ...asure 1x Bag11 Packers Phillips Screwdriver 1x Blue Masking Tape 1x BAG GB G sliding door guide blocks 1 x Clear Silicon 1 x BAG MG SCREWS 8x6 x10CSK screws 2x6 x40CSK screws 2 5mm drill bit 2 x Clear...

Page 2: ...efect must be visible to the naked eye in normal daylight conditions standing at a distance of two meters Any imperfection that is not visible within the above noted parameters will not be accepted by...

Page 3: ...hannels Use a straight edge and mark the wall to indicate where the wall channel is plumb 5 Apply a silicon bead to the full length of channels Silicon used must be compatible with anodised aluminium...

Page 4: ...wall channel 11 INSTALLATION OF THE RETURN PANEL Locate the glass panel 20 B into the glazing channel Adjust height of panel if necessary by adding or removing plastic packers bag11 in the base glazi...

Page 5: ...4x 6 x10CSK screws Fixed Panel this end 17 END CONNECTOR ANGLE MG 2W Fix the MG 2W end connector angle into place Screws should be left slightly loose 18 TOP TRACK AND DOOR PLACEMENT Stand inside the...

Page 6: ...the door as far back in an open position as possible Slip the sliding guide block under the door and locate it in line with the end of the fixed panel on the opening side Apply a small bead of silicon...

Page 7: ...d colour finish Install into the recess into the top track Sand the reverse face of the acrylic to allow for adhesion Apply 2 x 3mm beads of silicone to front face of top track Place the detail strip...

Page 8: ...1909 Revision By JST ACRYLIC LINER Z FLASHING When a 2mm Acrylic Wall liner has been supplied the aluminium Z Flashing will need to be trimmed Using a hacksaw trim the inside angle of the Z flashing a...

Page 9: ...nstalled on base prior to tiling Black Pearl Installed onto acrylic base when installing screens CODE ABS LQ GB SHORT Linea Quattro Installed after tiling or on an Architectural Finish when installing...