4
Any revisions must first be approved by the product designer. Version: 201909
Revision By: JST
9.
CRITICAL SEAL
Remove dust and dirt first. Seal the connection
between the glass receiver channel and the base
glazing channel with clear silicon prior to the
installation of panel
20 B.
Ensure the corner junction between wall
channel
and
base channel
is full of
silicon before
final glass
placement. It
is vital that all
junctions are
sealed
sufficiently.
Prior to installation of glass panels and infill use
the clear silicon supplied
10.
INSTALLATION OF FIXED PANEL
Locate the glass panel
20MG-F
into the glazing
channel. Add or remove plastic packers (
BAG11
)
in the base
glazing
channel as
necessary.
This panel
must
protrude
23mm above
the wall
channel.
11.
INSTALLATION OF THE RETURN PANEL.
Locate the glass panel
20 B
into the glazing
channel. Adjust height of panel if necessary by
adding or removing plastic packers (bag11) in
the base glazing channels.
12.
GLASS DOOR / TOP TRACK ASSEMBLY
Before proceeding check the length of the
supplied top track is correct. The top track
should fit between the wall and
20 B
glass
return panel and be the same measurement top
and bottom.
The next processes are easily achieved when the
door is laying flat on clean saw horses.
Alternatively use clean 50mm timber blocks on
the floor.
HANGER ASSEMBLY
The bolts on the
hangers must be
facing inside the
shower. Ensure
the direction of
the door is
correct. Fit 2x
hangers to the
door (note clear
gaskets fit 1x
inside, 1x
outside).
13.
SLIDING ASSEMBLY TO HANGER SET
Fit the idle rollers (sliding mechanisms) to the
hangers using 4mm hex key. The single wheel
must face to the outside of the glass door.