Any revisions must first be approved by the product designer. Version: 201710
Revision By: TD
GLASS RECEIVER CHANNEL MUST BE INSTALLED ONTO THE WATERPROOFING BEFORE THE WALLS ARE
TILED
Installer
–
When Architectural Finish is fitted to
base. Trim the internal leg off the wall channel to
adequately clear the base surface. Ensure the wall
channel interlocks correctly with the base.
1.
Choose door direction.
2.
1 x Glass Receiver Channel
Position the glass
receiver channel
over the base
glazing channel.
The channel will be
located on the
fixed panel side
only. Use a straight
edge and mark the
wall to indicate where the wall channel is
plumb.
3.
Apply a silicon seal to full length of channel.
Silicon used
must be
compatible with
anodised
aluminium as
well as the
waterproofing
being used.
4.
Ensure the glass
receiver channel
is located firmly
over the base
glazing channel.
The machine
recess in the wall
glazing channel
must firmly
locate over the
base glazing
channel. Locate
the framing timber. Use the 4mm drill bit to drill
holes through the glass receiver channel. Fix
four screws through the channel in the wall
framing (use wall plugs if required).
5.
Apply a continuous bead of silicon to the full
length of the channel and waterproofing,
indicated by
the dark line
(inside
channel).
6.
INSTALLATION OF TOP RAIL BRACE END
CONNECTOR CHANNELS AND SPACER
Fix the first top rail brace end connector channel
and spacer directly below the indicator line on
the glass receiver channel as shown. Detail
shown below.
Must be accurate.
120mm from
top of wall
channel to
top of end
connector
channel.