Set the switches, levers and controls listed below to the specified positions when the
screed has reached its operating temperature and a sufficient amount of material lies
in front of the screed:
- Push the drive lever (14) all the way to the front and start driving.Screed floating
position is activated now.
- Observe the distribution of the material and adjust the limit switches if necessary.
- Set the compacting elements (tamper and/or vibration) according to the required
compaction ratio.
- Let the paving master check the layer thickness after 5–6 meters and correct if nec-
essary.
Carry out the check in the area of the drive chains or wheels as the screed tends to
level an uneven ground. The reference points for the layer thickness are the drive
chains or wheels.
The basic setting of the screed must be corrected when the actual layer thickness de-
viates significantly from the values indicated by the scales (see the operating instruc-
tions for the screed).
A
The basic setting is for asphalt material.
Item
Switch
Position
1
Machine movement fast/slow
slow („tortoise“)
2
Preselector regulator On / Off
On (at the bottom)
3
Engine RPM (
o
)
Maximum
4
Screed stop
Auto
5
Screed position
to floating position.
6
Vibrator (
o
)
Auto
7
Tamper (
o
)
Auto
8
Left/right auger
Auto
9
Left/right feeder
Auto
10
Speed regulator, tamper
about 40-60 divisions
11
Vibration speed regulation
about 40-60 divisions
12
Feeder Auto
13
Auger
Auto
Summary of Contents for DYNAPAC Svedala Demag DF 115 C
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 58: ......
Page 62: ...D 1 4 4 D_1 4_01_GB fm 4 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 64: ...D 1 4 6 D_1 4_01_GB fm 6 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 96: ......
Page 120: ...D 4 6 24 D_4 6_01_GB fm 24 38 2 2 Error messages...
Page 121: ...D 4 6 25 D_4 6_01_GB fm 25 38...
Page 122: ...D 4 6 26 D_4 6_01_GB fm 26 38...
Page 123: ...D 4 6 27 D_4 6_01_GB fm 27 38...
Page 124: ...D 4 6 28 D_4 6_01_GB fm 28 38...
Page 125: ...D 4 6 29 D_4 6_01_GB fm 29 38 2 3 FMI codes...
Page 134: ......
Page 146: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 152: ......
Page 154: ......
Page 157: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 161: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 168: ......
Page 180: ......
Page 181: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 220: ......
Page 221: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 226: ......