Screed control with the paver finisher at standstill - with floating position pre-
stressing
Similarly to the screed charging and relieving function, a pressure between 2 and 50
bars can be generated with the lifting cylinders of the screed. This pressure acts
against the mass of the screed to prevent its sinking into the freshly laid mixture.
The pressure to be applied depends on the load-bearing capacity of the material. If
necessary, the pressure must be readjusted or changed as required during the first
stops until the lower edge of the screed no longer leaves any marks when the paver
finisher moves on again.
A pressure greater than 10-15 bar neutralizes the screed weight, thus preventing the
screed from sinking into the material.
A
The pressure is set in the factory to about 20 bars.
Especially in those cases where the ”screed relieving” function is only briefly used as
a start-up aid, there is a danger of uncontrolled floating when starting up again.
Adjusting the pressure
Pressure adjustments can only be made
while the diesel engine is running.
Therefore:
- Start the Diesel engine, turn the feed
regulator (1) down to zero.
- Set switch (2) to the „floating position“.
Element2_konv_Kette_635.bmp/
1
Screedswitch_all.bmp
2
B
A
C
Summary of Contents for DYNAPAC Svedala Demag DF 115 C
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 58: ......
Page 62: ...D 1 4 4 D_1 4_01_GB fm 4 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 64: ...D 1 4 6 D_1 4_01_GB fm 6 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 96: ......
Page 120: ...D 4 6 24 D_4 6_01_GB fm 24 38 2 2 Error messages...
Page 121: ...D 4 6 25 D_4 6_01_GB fm 25 38...
Page 122: ...D 4 6 26 D_4 6_01_GB fm 26 38...
Page 123: ...D 4 6 27 D_4 6_01_GB fm 27 38...
Page 124: ...D 4 6 28 D_4 6_01_GB fm 28 38...
Page 125: ...D 4 6 29 D_4 6_01_GB fm 29 38 2 3 FMI codes...
Page 134: ......
Page 146: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 152: ......
Page 154: ......
Page 157: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 161: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 168: ......
Page 180: ......
Page 181: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 220: ......
Page 221: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 226: ......