D 3.1 15
D_3
.1_0
1_G
B.
fm
1
5
-1
6
Adjustment of screed eccentric (
o
)
(104)
To pave thicker layers of material, if the
piston rods in the levelling cylinder are
operating close to their limit position and
if the desired paving thickness cannot be
reached, it is possible to alter the ap-
proach angle of the screen by adjusting
the eccentric.
- Pos I:
Paving thickness of up
to approx. 7cm
- Pos II:
Paving thickness of approx.
7 cm to approx. 14cm
- Pos III: Paving thickness above
approx. 14 cm
- The spindle (A) is not adjusted.
- Unfasten lock nuts (B) for eccentric adjustment.
- Swivel screed into desired position using lever (C) then engage the locking knob
once again.
A
If the levelling unit is connected to a height controller, this has the function of balanc-
ing out any rapid rise in the screed position: The levelling cylinders are extended until
the correct height is reached.
A
The change in approach angle can only take place slowly and uniformly on both sides
at once during paving operation, and involves the use of the eccentric adjustment.
Failing this, any rapid response in the screed could easily cause waves to appear on
the road surface.
The setting process should therefore take place before work starts!
Wetterhaus.eps
(
o
)
C
B
III
II
I
A
Summary of Contents for DYNAPAC Svedala Demag DF 115 C
Page 2: ...VALUE QUALITY THE ORIGINAL Your Authorized Dynapac Dealer...
Page 10: ......
Page 18: ......
Page 20: ......
Page 44: ......
Page 58: ......
Page 62: ...D 1 4 4 D_1 4_01_GB fm 4 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 64: ...D 1 4 6 D_1 4_01_GB fm 6 22 Element2_konv_Kette_635 bmp 9 12 9a 5 8 14 A 6 7 13...
Page 96: ......
Page 120: ...D 4 6 24 D_4 6_01_GB fm 24 38 2 2 Error messages...
Page 121: ...D 4 6 25 D_4 6_01_GB fm 25 38...
Page 122: ...D 4 6 26 D_4 6_01_GB fm 26 38...
Page 123: ...D 4 6 27 D_4 6_01_GB fm 27 38...
Page 124: ...D 4 6 28 D_4 6_01_GB fm 28 38...
Page 125: ...D 4 6 29 D_4 6_01_GB fm 29 38 2 3 FMI codes...
Page 134: ......
Page 146: ...E 01 12 E_01_GB fm 12 18 3 Auger extension auger type II Auger_DEM bmp...
Page 152: ......
Page 154: ......
Page 157: ...F 3 0 1 F_3 0_01_GB fm 1 4 F 3 0 Maintenance Conveyor 1 Maintenance Conveyor...
Page 161: ...F 4 1 1 F_4 1_01_GB fm 1 8 F 4 1 Maintenance Auger 1 Maintenance auger sub unit...
Page 168: ......
Page 180: ......
Page 181: ...F 6 0 1 F_6 0_01_GB fm 1 8 F 6 0 Maintenance Hydraulic system 1 Maintenance hydraulic system...
Page 220: ......
Page 221: ...F 10 0 1 F_10 0_01_GB fm 1 6 F 10 0 Checks decommissioning 1 Tests check up cleaning stopping...
Page 226: ......