Control panel
Step
Action
1
Switch on the voltage. Voltage on LED (6) lights up.
2
Close the condensate drain valves (see the section
Cooling and condensate system)
.
3
Open the air outlet valve.
4
Check the oil level indicator (see the section
. The pointer should be in the
green range or orange range.
5
On compressors with integrated dryer, check that the by-pass valve is closed and that the
inlet and outlet valves of the dryer are open (see the section
.
Open the water shut-off valves and the water regulating valve.
5.3
Starting
Warning
The operator must apply all relevant
.
On Full-Feature compressors, switch on the voltage 4 hours before starting in order to
energise the crankcase heater of the refrigerant compressor.
Instruction book
82
2920 1475 06
Summary of Contents for GA110
Page 1: ...GA 90 GA 110 GA 132 GA 160 GA 200 GA 250 GA 315 ...
Page 2: ......
Page 17: ...Flow diagram of GA200 GA250 and GA315 60 Hz Instruction book 2920 1475 06 15 ...
Page 30: ...Menu flow for GA 90 up to GA 315 simplified example Instruction book 28 2920 1475 06 ...
Page 57: ...Dimension drawing of GA90 110 water cooled Instruction book 2920 1475 06 55 ...
Page 60: ...Dimension drawing of GA200 250 and GA315 60 Hz air cooled Instruction book 58 2920 1475 06 ...
Page 64: ...Compressor room example of GA 90 up to GA 160 water cooled Instruction book 62 2920 1475 06 ...
Page 76: ...Suspended solids Non soluble particles size 1 mm 10 ppm Instruction book 74 2920 1475 06 ...
Page 98: ...Filler and drain plugs on GA 200 up to GA 500 compressors Instruction book 96 2920 1475 06 ...
Page 102: ...Position of oil filter on GA 200 up to GA 500 Instruction book 100 2920 1475 06 ...
Page 133: ...Instruction book 2920 1475 06 131 ...
Page 134: ......
Page 135: ......