Troubleshooting
EN
PFD1500RA-180
56
© Atlas Copco Industrial Technique AB - 9836 6024 01
Leak test
1.
If the valve is attached to the tool, remove it . Use the fork-shaped tool (4080 1114 00) and turn it
clockwise.
2.
Insert the valve in the connector (1) of the test tool and tighten it to 0.7 Nm. See the figure below.
3.
Connect an air hose to the connector (2).
4.
Press the tool lever two to three times to supply the air pressure of 6.3 bar (90 psi).
5.
Measure the leakage with a leakage meter. Air leakage during 10 seconds must be less than 0.3 l/
min.
6.
If the result of the test is unsatisfactory, replace the valve. If the test shows no fault, continue the pro-
cedure.
7.
Install the valve in the original position and tighten it with the fork-shaped tool to 0.7 Nm.
Summary of Contents for PFD1500RA-180
Page 15: ...PFD1500RA 180 EN Installation Atlas Copco Industrial Technique AB 9836 6024 01 15 ...
Page 16: ...Installation EN PFD1500RA 180 16 Atlas Copco Industrial Technique AB 9836 6024 01 ...
Page 26: ...Installation EN PFD1500RA 180 26 Atlas Copco Industrial Technique AB 9836 6024 01 ...
Page 48: ...Service EN PFD1500RA 180 48 Atlas Copco Industrial Technique AB 9836 6024 01 ...
Page 58: ......
Page 59: ......