- 79 -
Check tightness of nuts and bolts
x
x
Grease door hinges and locks
x
x
Change lubrication oil
(3)
x
x
x
Replace oil filter(s)
(3)
x
x
x
Replace air filter element
(4)
x
x
x
Grease mechanical links (e.g. fuel solenoid link)
x
x
x
Measure alternator insulation resistance (See (*) Measuring the
alternator insulation resistance)
x
x
x
Check glycol level in coolant
x
x
x
Check pH level of coolant
x
x
x
Replace and drain fuel pre-filter/Water separator
x
x
Replace fuel filter element
x
x
Check crankcase pressure
x
x
Check fixation of hoses, cables and pipes
x
x
Replace drive belt(s)
x
Replace safety cartridge
x
Clean and inspect turbocharger impeller and housing
x
Lubricate fan hub bearings
x
Check fueltank for water (5)
x
Inspection by Atlas Copco Service technician
Generators in standby application have to be tested on a regular
basis. At least once a month the engine should run for one hour. If
possible a high load (> 30%) should be applied so that the engine
reaches its operating temperature.
Summary of Contents for QAS 500 Volvo S2A APP
Page 1: ...QAS 500 Volvo S2A APP Instruction Manual for AC Generators English...
Page 2: ......
Page 99: ...99 Circuit diagrams...
Page 112: ......
Page 113: ......
Page 114: ...Printed in Belgium 05 2009 2954 3870 00 www atlascopco com...