– 12 –
IP100 / IP108 / IP116
Owner’s Manual
AtlasIED.com
TELEPHONE: (800) 876-3333
SUPPORT@ATLASIED.COM
1601 JACK MCKAY BLVD.
ENNIS, TEXAS 75119 U.S.A.
Connect Power Plug
Connect the cable from the IED1112PSD in-line 12V power supply or the IED1112PS rack mount 12V power supply system to the power connection on
the back of the unit. If main power is present, the unit will immediately boot up. The fan will run and the LCD display on the front panel will illuminate.
When the unit’s power supply is connected to a 230VAC mains line, to avoid excessive EMI from the unit, the ferrite filter should be installed on the
power inlet within a few inches of the connector. This ferrite can be installed in 120VACS mains applications as well, if desired, with no harmful effects.
The ferrite filter simply clamps over the wire as shown in the figure below. (The reason the ferrite is not pre-installed is that there is more than one
power supply option that can be ordered and used.)
Complete Unit Configuration
Once the unit is booted up, complete the system configuration using the supplied configuration software. This is accomplished using either a
keyboard, mouse and monitor connected directly to the unit or via remote connection through the network. Refer to the appropriate user guides for
the specific model configuration to complete the unit setup.
For 230VAC Mains
applications, the ferrite
filter included with the unit
must be installed near the
connector in the vicinity
marked here.