Warranty
The debugging phase
Atlas Scientific
™
Warranties the EZO-PMP
™
Embedded Dosing Pump to be free of defect
during the debugging phase of device implementation, or 30 days after receiving the EZO-
PMP
™
Embedded Dosing Pump(which ever comes first).
The debugging phase as defined by Atlas Scientific
™
is the time period when the EZO-
PMP
™
Embedded Dosing Pump is inserted into a bread board, or shield. If the EZO-PMP
™
Embedded Dosing Pump is being debugged in a bread board, the bread board must be
devoid of other components. If the EZO-PMP
™
Embedded Dosing Pump is being connected
to a microcontroller, the microcontroller must be running code that has been designed to
drive the EZO-PMP
™
Embedded Dosing Pump exclusively and output the EZO-PMP
™
Em-
bedded Dosing Pump data as a serial string.
• Soldering any part of the EZO-PMP
™
Embedded Dosing Pump.
• Running any code, that does not exclusively drive the EZO-PMP
™
Embedded
Dosing Pump and output its data in a serial string.
• Embedding the EZO-PMP
™
Embedded Dosing Pump into a custom made device.
• Removing any potting compound.
It is important for the embedded systems engineer to keep in mind that the following
activities will void the EZO-PMP
™
Embedded Dosing Pump warranty:
r 0.1
75
Copyright © Atlas Scientific LLC