Installation
21
PV-15P
Installation
Only skilled technicians, appointed by the manufacturer, or by
authorized dealers, must be allowed to carry out installation.
Serious damage to people and to the lift can be caused if
installations are made by unskilled personnel.
Always refer to the exploded views attached during installation.
7.1 Tool
Required
Rotary Hammer Drill D.19
Hex-Key/Allen Wrench Set
Masonry Bit
Crow Bar For Shim Installation
Hammer
Chalk Line
Level
Medium Cross Screwdriver
Open-End Wrench Set
Medium Flat Screwdriver
Medium Crescent Wrench
Tape Measure
7.2 Checking For Room Suitability
The lift has been designed to be used in covered and sheltered places free of
overhead obstructions.
The place of installation must not be next to washing areas, painting
workbenches, solvent or varnish deposits. The installation near to rooms, where
a dangerous situation of explosion can occur, is strictly forbidden. The relevant
standards of the local Health and Safety at Work regulations, for instance, with
respect to minimum distance to wall or other equipment, escapes and the like,
must be observed.
7.3 Lighting
Lighting must be carried out according to the effective regulations of the place of
installation. All areas next to the lift must be well and uniformly lit.