Installation
25
PV-15P
7.10 Routing Equalizer Cables
• Use an appropriate lifting equipment to raise the carriage to the fi rst latch
position. Be sure the carriage is engaged securely before attempting to
route the equalizer cables. Carriages must be equal height from the fl oor
before proceeding;
• With the carriages in equal height, route the equalizer cables as shown.
Make sure the cables in the place on the pulleys. Make sure the cables
routed properly;
• After the equalizer cables have been routed, adjust the nut to make each
cable in equal tension by using the special wrench supplied.
Figure 12 – Routing Equalizer Cable