4
Assembly and commissioning
4.1
Set up guidelines
)
Lift set up is done by trained manufacturer per-
sonnel or a contract partner. If the operating
company has appropriately trained assemblers,
the system can also be set up by them. Set up is to
be done according to the assembly instructions.
)
A standard system may not be set up in explosion
endangered spaces or wash halls.
)
*efore !etting up, verify that there i! a !ufficient
foundation or make it according to the guidelines
in the foundation plan. The set up location must
be level and even. Foundations in open air and
spaces where winter storms or frost are to be ex-
pected, must have a foundation to frost depth.
The operating company is solely responsible for
the set up location.
)
Provide an on-!ite electrical connection of 3
“”N
+ PE, 400 V, 50 Hz, fuses with 16 A, slow. The con-
nection point is on the operating unit.
)
To protect the electrical cable all cable conduits
are to be fitted ;ith cable !leeve! or
fle’ible
pla!-
tic pipes.
)
After !ucce!!ful lift in!tallation and before fir!t
commissioning, the operating company must
have the lift grounding conductors inspected on-
!ite according to IEC regulation (6036"-6-61). An
insulation resistance test is also recommended.
4.2
Setting up the lift
Before setting up the lift, ensure that everything
possible is done to prevent accidents due to care-
less assembly. This includes, above all, the use of
!afe
au’iliary
mean! (e.g. crane!, forklift! and a !uf-
ficient number of people), diver!e !upport! and a
!ufficient barrier to prevent unauthorized acce!!.
)
Carefully remove the lift from the wooden crate
and check for damage.
)
Position the lift according to the data sheet at the
desired set up location.
)
Set up the unit, connect power supply.
i
The set up location of the operating unit can be
selected from two variants. Either in the drive-in
direction at the front right or left.
)
Fill with hydraulic oil, the manufacturer recom-
mends a high value hydraulic oil with a viscosity of
32 cst. The required oil volume is approx. 14 litres.
After filling, the oil mu!t be bet;een the mark! on
the oil dip!tick or
appro’.
2 cm belo; the oil filling
!upport! (11).
13
12
14
15
11
11 Oil filling supports
002
12 A1
13 A2
14 N1
15 N2
)
Move the lifting upwards to approx. 1,500 mm
)
Check the alignment of the base plates again
and anchor the lift. +ole! for floor anchoring are
to be placed through the holes in the base plates.
Clean the bore holes by blowing them out with
air. Insert safety anchors into the holes.
The manufacturer recommends using approved
safety anchors and to follow anchor manufac-
turer's instructions.
Before anchoring the lift, check whether the con-
crete i! of quality
C20”25
up to the fini!hing level
of the completed floor. In thi! ca!e, take the an-
chor length from the anchor manufacturer's data
!heet. If there i! a floor covering (tile!, !creed) on
the weight bearing concrete, the thickness of this
covering must be determined.
)
Anchor the unit to the floor.
54
JUMBO LIFT 3200 NT - HYMAX XX 3200 PH
19.05.2015
AD H9402