)
Align the lift
To prevent hollow spaces, correct any uneven-
ne!! in the floor by putting !him! under the ba!e
frame (e.g thin metal !trip!). U!e !uitable !upport!
to en!ure continuou! contact bet;een the floor
and base frame.
)
Tighten safety anchors with torques recommend-
ed by the manufacturer.
!
Each anchor must be tightened to the required
torque. Safe operation of the lift is not guaran-
teed with a lower torque.
Follow the instructions of the anchor manufac-
turer.
)
Move the lift upwards and downwards several
times, then check the anchors with the torque
wrench and tighten if required. Check the hy-
draulic lines for leak-tightness.
)
Balance the lift again if required.
)
Mount all hose covers.
)
Anchor the foot bumpers included beside the lift
on the floor. For thi!, lo;er the lift to the lo;e!t po-
sition. Position the foot bumpers and permanently
anchor them Distance between the drive in rails
and the foot bumper!
appro’.
20 mm (foot bum-
pers may not touch the drive in rails.
4.3
Fill and vent the hydraulic systems
) The lift is factory pre-installed; meaning the hoses
and pipe connections are properly assigned.
Finally, check the power connection, check for
correct hydraulic oil in the proper volume and
leak-tightness of the connection when setting up
the lift.
If the hose connections are still open, e.g. for the
purposes of hose extension, then air may be en-
trapped resulting in start up problems or challeng-
es with smooth running.
Check and ensure proper allocation of hose con-
nections.
!
This procedure must always be completely car-
ried out. This means, first fill and then vent.
Correct method of filling and balancing (lift with Hy-
perFlow system):
)
Clo!e the emergency di!charge !cre;! "N1" (1")
and "N2" (15).
)
Push the
o
"Lift" button to move the lift upwards
without a load to the maximum height.
)
Continue holding the
o
"Lift" button. This starts the
"Overflo; procedure". Oil flo;! from the hydraulic
pump through the command and downstream
cylinders and back into the tank.
)
)
After releasing the
o
"Lift" button, the lift lowers a
fe; millimetre! and clo!e! the overflo; opening!.
)
The system is now vented and smooth operation
can happen.
)
The lift now has its normal operating function.
Position of the foot bu mpers
016
AD H9402
19.05.2015
JUMBO LIFT 3200 NT - HYMAX XX 3200 PH
55
20 mm
Summary of Contents for HYMAX XX 3200 PH
Page 3: ...ENGLISH Translation...