18
Power-Up
Figure 4
1) Press the green start button to turn the display on.
Figure 5
2) To engage the turbine -Turn the key switch to the right (to position 2)
and hold for app. 5 seconds.
The key will automatically return to the middle (position 1), when
released.
See Figure 10
3) The pre-heater symbol in the display will flash, and the current
temperature will be displayed, when above app. 50˚C.
Figure 6
4) The “Start-up/Wait” symbol flashes.
5) It is important to move the machine, when the Start-up/Wait
indication flashes in order to avoid burn marks on the ground.
Summary of Contents for Zirocco-M100
Page 1: ...Operating Manual Zirocco M100 Jet Dryer Cleaner...
Page 25: ...25 Dimensions...
Page 26: ...26...