background image

 

Instruction manual Civil V1.0 _ XX-09-2020 _ FttX-Distribution Closure AT29030 _ Page 4 of 6 

 

12. Remove the housing from the packaging.  

 
Pull the bundled cables / ducts through the  
rectangular opening.  

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

13. Place the housing on the base plate and  

click it into place (clicks in 4 places). 

 
 
 
 
 
 
 
 
 
 

14. 

Wrap 

the bundle of cables / ducts up in the  

housing. Make sure to push the bundle  
against the wall in the corners. 

 

!! Make sure

 the cables/ducts do not bend  

while storing them back in the closure 

!!

 

 

Do 

not

 bundle the cables / ducts in the  

corners, only along the straight edges. If  
necessary, slide the Velcro strip to a  
different position. 

 

 
 

15. Remove the lid from the packaging. 

Check the foam strip for damage. 

 

Brush the top edge of the housing to  
remove any soil. 

 

Place the lid on the housing. 

 

 

“Click” 

“Click” 

Reviews: