EN | Blast chillers | User and maintenance manual
30
1.8 BLAST CHILLER WITH BUILT IN CONDENSING UNIT
The blast chiller is provided with built in condensing unit, therefore it is necessary not to obstruct the blast
FKLOOHUIUHH]HUDLULQOHWFRUUHVSRQGLQJWRWKHIURQWJULGIRUWKHDLUH[WUDFWLRQLQRUGHUWRDOORZDSURSHUDLU
FLUFXODWLRQ.HHSFOHDUWKHZKROHEODVWFKLOOHUIUHH]HUSHULPHWHU
:HUHPLQG\RXWKDWURRPWHPSHUDWXUHULVHVRULQVXIÀFLHQWTXDQWLW\RIDLUWRWKHXQLWFRQGHQVHUUHGXFHWKH
blast chiller performances with possible deterioration of the products and more energy consumption. If the
EODVWFKLOOHUIUHH]HUZLWKEXLOWLQFRQGHQVLQJXQLWZDVOHDQWRQWKHVLGHGXULQJWUDQVSRUWDWLRQZHVXJJHVW\RXWR
keep the product in upright position for at least 8 hours, before switching it on. In this way, you will allow the oil
WRÁRZLQDOOWKHFRPSRQHQWVOXEULFDWLQJWKHPDJDLQ$IWHUZDUGV\RXFDQSURFHHGZLWKWKHVWDUWLQJ
2 ELECTRICAL CONNECTION AND EARTHING
2.1 ELECTRICAL POWER SUPPLY
The installation and the electrical connections must be carried out in conformity with the elec-
WULFDOUXOHVLQIRUFH7KHVHRSHUDWLRQVPXVWEHFDUULHGRXWE\TXDOLÀHGVWDII7KHFRPSDQ\GHFOLQHV
any responsibilities originated from the no observance of the above rules in force.
6HHWKHEODVWFKLOOHUHOHFWULFGLDJUDPVDW´$33(1',&(µ3DJ
%HIRUHSOXJJLQJLQWKHEODVWFKLOOHULWLVQHFHVVDU\WRSURFHHGZLWKLWVFRPSOHWHDQGFDUHIXOFOHDQLQJXVLQJZDUP
water with no aggressive detergents and drying with a soft cloth all the humid parts (read with attention the
FKDSWHU´&/($1,1*µ3DJ
In order to carry out a correct plug in you must proceed as follow:
•
Prearrange a thermal magnetic circuit breaker switch
DQGEHVXUHWKDWWKHIUHTXHQF\WHQVLRQRIWKH
OLQHFRUUHVSRQGVWRWKDWVKRZQRQWKHEODVWFKLOOHUVHULDOQXPEHUODEHOVHH´$33(1',&(µ3DJ
•
Verify the supply tension at the socket,
LWPXVWEHEHWZHHQZKHQ\RXVWDUWWKHFRPSUHVVRU
•
We recommend you to install a bipolar-switch
(or 4 square pole switch) with contact opening of at
least 3 mm, at the head of the socket. This switch is obligatory if the loading is over 1000 W or when the blast
chiller is connected directly without the use of the plug. The mag thermic switch has to be placed nearby the
blast chiller in order to be well seen by the technician in case of maintenance.
,WLVQHFHVVDU\WKDWWKHSRZHUVXSSO\FDEOHVHFWLRQLVDGHTXDWHWRWKHXQLWSRZHUFRQVXPSWLRQ
•
7KHODZUHTXLUHVWKDWWKHXQLWLVHDUWKHGWKHUHIRUHLWLVQHFHVVDU\WRFRQQHFWLWWRDQ
HIÀFLHQWHDUWKFRQQHFWLRQ,QRUGHUWRSUHYHQWDQ\ULVNV
If the power supply cable is
damaged, it must be substituted by the manufacturer or by its technical assi-
stance service
,QVWDOODWLRQPXVWEHFDUULHGRXWRQO\E\TXDOLÀHGWHFKQLFLDQVDFFRUGLQJWR
the regulation in force. No liability whatsoever can be accepted if the above instructions
in not complied with.
•
Nel caso in cui il compressore sia danneggiato,
questo deve essere sostituito esclusivamente da perso-
nale specializzato in modo da prevenire ogni rischio. Si consiglia, per evitare in caso di guasto di disinserire tutto
l’impianto, di utilizzare come sezionatore un interruttore magnetotermico con differenziale da alta sensibilità.