V4.5
©2015-2019 AUBO.All rights reserved.
29
6.
ROBOT INSTALLATION
Brief installation steps
The installation of AUBO robots includes:
1.
Define a robot workspace;
2.
Install the robot manipulator on base;
3.
Install end-effector
Important safety instructions
Installation Conditions
:
•No corrosive gases or liquids •No oil mist
•No salt •No dust or metal powders
•No mechanical shock, vibration •No electromagnetic noise
•No radioactive materials •Low humidity
•No flammable materials
•Ambient temperature:0°C ~ 45°C
•Avoid direct sunlight (avoid using outdoor)
Floor carrying capacity
:
Install manipulator on a hard surface which can undertake at least 10 times
heavier than overturning moment of robot base and at least 5 times the weight of
the manipulator. Moreover, the surface cannot be shaken. Please read appendix
for more precise data of carrying capacity.
Safety assessment is needed after every installation. Please strictly follow the
instructions in chapter 1(Safety).
Summary of Contents for AUBO-i10
Page 1: ...USER MANUAL AUBO i10 CB4 Please read this manual carefully before using the product...
Page 2: ......
Page 10: ...V4 5 2015 2019 AUBO All rights reserved vi...
Page 26: ...V4 5 2015 2019 AUBO All rights reserved 22...
Page 44: ...V4 5 2015 2019 AUBO All rights reserved 40...
Page 56: ...V4 5 2015 2019 AUBO All rights reserved 52...
Page 87: ...V4 5 2015 2019 AUBO All rights reserved 83...
Page 127: ...V4 5 2015 2019 AUBO All rights reserved 123...
Page 161: ...V4 5 2015 2019 AUBO All rights reserved 157 Figure 11 43 script file editor...
Page 179: ......