V4.5
©2015-2019 AUBO.All rights reserved.
42
Electrical warnings and cautions
The following warnings and cautions must be observed when a robot and control box application is
designed and installed. The warnings and cautions also apply for service work.
Never connect safety signals to a PLC which does not fulfill the requirements of a
correct safety level. Failure to follow this warning could result in serious injury or
death due to the failure of the safety stop function
1.
Make sure that all non-waterproof equipment remains dry. If water comes inside the
product, turn off all the power switches and then contact your supplier.
2.
Use original cables supplied with the robot only. Do not use the robot for
applications where the cables will be subjected to bent. Contact your supplier if
longer or flexible cables are needed.
3.
All mentioned GND connections are only for powering and transimitting signals.
For Protective Earth (PE) use the screw connections marked with the earth symbols
inside the control box. The grounding conductor shall have at least the current rating
of the highest current in the system.
4.
Be careful when installing the interface cables to the robot’s I/O.
As shown in the figure below, the red frame area is AC 100-240V and DC 48V
hazardous area. Do not touch the fastening screws and other metal parts directly by
hand. Do not remove the wiring by power.
Control box panel introduction
The front panel, side panel and back panel of the control box are related to switches, buttons, indicators and
electrical interfaces.
Summary of Contents for AUBO-i10
Page 1: ...USER MANUAL AUBO i10 CB4 Please read this manual carefully before using the product...
Page 2: ......
Page 10: ...V4 5 2015 2019 AUBO All rights reserved vi...
Page 26: ...V4 5 2015 2019 AUBO All rights reserved 22...
Page 44: ...V4 5 2015 2019 AUBO All rights reserved 40...
Page 56: ...V4 5 2015 2019 AUBO All rights reserved 52...
Page 87: ...V4 5 2015 2019 AUBO All rights reserved 83...
Page 127: ...V4 5 2015 2019 AUBO All rights reserved 123...
Page 161: ...V4 5 2015 2019 AUBO All rights reserved 157 Figure 11 43 script file editor...
Page 179: ......